 |
 |
 |
Site Visit Reports Jan 1990-Jun 2026 |
 |
 |
updated 2015169+1914 by lloyd |
|
| Date |
Report |
Action(s) |
Summary |
|
Jul 29 2014
|
|
Repaired |
Inspected grounding, cleaned datasonde well |
|
Feb 08 2011
|
|
Repaired |
Replaced YSI cable, reconnected external power |
|
Dec 09 2009
|
|
Repaired |
Disconnected external power to YSI |
|
Nov 12 2009
|
|
Repaired |
Replaced tube (6"D, 68.5"L) |
|
Nov 05 2009
|
|
Repaired |
Replaced tube (6"D, 68.5"L) |
|
Oct 19 2009
|
|
Established |
Installed station |
|
 |
 |