524: Port Arthur
Sabine Lake
29° 52' 1" N   93° 55' 51" W
PTARTH
87704751
 TCOON Site Visit Reports
Jan 1990-Mar 2010
updated 2010008+1503 by amendoza
Jan 06 2010 TCOON [Inspected Repaired] - replaced ip modem
Nov 20 2009 TCOON [Inspected Repaired] - replaced aquatrak head, cal tube
Nov 11 2009 TCOON [Inspected Repaired] - replaced wind sensor
Oct 13 2009 TCOON [Inspected] - TGLO Annual levels.
Jun 02 2009 TCOON [Inspected Repaired] - Replaced Satlink2
May 04 2009 TCOON [Inspected Repaired] - Replaced aquatrak head and tube
Dec 04 2008 TCOON [Inspected Repaired] - establish comms
Oct 01 2008 TCOON [Inspected] - TGLO post Ike levels.
May 21 2008 TCOON [Inspected] - Relaced aquatrak head, tube and satlink2
Feb 27 2008 TCOON [Inspected] - TGLO Annual levels.
Oct 04 2007 TCOON [Inspected Repaired] - Replaced solar panel regulator
Feb 08 2007 TCOON [Inspected] - TGLO Levels.
Jan 31 2007 TCOON [Repaired] - Changed IP modem settings
Nov 08 2006 TCOON [Inspected] - Levels performed
Aug 16 2006 TCOON [Established] - Installed new station
Nov 10 2005 TCOON [Removed] - Ran closing levels and removed station.
May 25 2005 TCOON [Inspected Repaired] - Performed O&M & Ran Levels
Jan 11 2005 TCOON [Inspected] - Levels run by TGLO.
Oct 25 2004 TCOON [Inspected] - Dive inspection
May 25 2004 TCOON [Inspected Repaired] - Performed O&M and Ran Levels.
May 21 2004 TCOON [Inspected Repaired] - Enabled GOES
May 04 2004 TCOON [Inspected Repaired] - TGLO levels
Feb 03 2004 TCOON [Inspected Repaired] - Enabled GOES, Cleared resets
Jul 23 2003 TCOON [Inspected Repaired] - Replaced wind sensor and cable, trimmed branches.
Jun 16 2003 TCOON [Inspected] - Download log, Enable GOES
May 20 2003 TCOON [Inspected] - DNR O & M
Jan 07 2003 TCOON [Inspected] - TGLO levels.
Apr 03 2002 TCOON [Inspected Repaired] - Perform O&M and ran levels.
Jan 07 2002 TCOON [Inspected] - TGLO levels.
Oct 30 2001 TCOON [Inspected] - TGLO Levels
Jul 25 2001 TCOON [Inspected Repaired] - Installed uhf sat radio board & comm controller board; downloaded log
Feb 13 2001 TCOON [Inspected Repaired] - Replaced wind sensor.
Aug 02 2000 TCOON [Inspected Repaired] - Reset DCP
Jun 13 2000 TCOON [Inspected] - CBI - O&M and Levels
Jun 12 2000 TCOON [Inspected] - O&M and levels
May 22 2000 TCOON [Inspected Repaired] - Installed New Solar panel
May 08 2000 TCOON [Inspected Repaired] - Installed New Battery
Oct 06 1999 TCOON [Inspected Repaired] - Installed New Sat Board
Sep 16 1999 TCOON [Inspected Repaired] - Installed new battery and solar panel
Sep 07 1999 TCOON [Inspected Repaired] - Disenabled water temp
Aug 03 1999 TCOON [Repaired] - Reinstalled sutron
Jul 19 1999 TCOON [Removed] - removed sutron
Feb 24 1999 TCOON [Inspected] - Replaced fuse in power supply
Sep 23 1998 TCOON [Inspected] - Replaced c/t sensor, cpm, and mex.
Sep 03 1998 TCOON [Inspected] - Cleaned CT sensor.
Aug 15 1998 TCOON [Inspected] - Hard reset by phone
May 03 1998 TCOON [Inspected] - Hard reset by phone
Mar 13 1998 TCOON [Inspected] - Routine annual maintenance
Jan 20 1998 TCOON [Repaired] - Install new batteries
Jan 09 1998 TCOON [Repaired] - Upgrade sdl to ver Js1.12x.
Jan 08 1998 TCOON [Repaired] - Gauge batteries not charging, install new power board.
Dec 30 1997 TCOON [Inspected] - Reset time
Aug 05 1997 TCOON [Inspected] - Clean stilling well
May 28 1997 TCOON [Inspected Repaired] - Routine maintenance and replace CT sensor
Mar 28 1997 TCOON [Inspected Repaired] - Check calibration of CT sensor
Mar 05 1997 TCOON [Repaired] - Break in phone line, rewired existing connection.
Feb 28 1997 TCOON [Inspected] -