|
Aug 24 2009
|
TCOON |
[Inspected Repaired] - Replace cal a, b and install wind |
|
Feb 11 2009
|
TCOON |
[Repaired] - Repair to Ike Damage |
|
Oct 10 2008
|
TCOON |
[Inspected] - Hurricans Ike Damage |
|
Feb 28 2008
|
TCOON |
[Inspected] - TGLO Annual levels |
|
Feb 07 2007
|
TCOON |
[Inspected] - TGLO levels |
|
Jan 25 2007
|
TCOON |
[Inspected Repaired] - Replaced aquatrak |
|
Jan 02 2007
|
TCOON |
[Inspected Repaired] - Replaced Cal A |
|
Jun 06 2006
|
TCOON |
[Inspected Repaired] - Replaced Aquatrak and tube |
|
Jun 01 2006
|
TCOON |
[Inspected Repaired] - Constructed pier, upgraded X-Dark |
|
Feb 15 2006
|
TCOON |
[Inspected Repaired] - TGLO levels |
|
Jan 10 2006
|
TCOON |
[Inspected Repaired] - Ran Levels |
|
Aug 15 2005
|
TCOON |
[Established] - Installed new CMP Cycle 9 Platform |
|
Aug 05 2005
|
TCOON |
[Inspected Repaired] - download log |
|
Jul 08 2005
|
TCOON |
[Inspected Repaired] - reset time, download log |
|
Jul 06 2005
|
TCOON |
[Inspected Repaired] - replaced battery, download log, reset dcp |
|
Jun 02 2005
|
TCOON |
[Inspected Repaired] - Enter new c2, download log |
|
May 24 2005
|
TCOON |
[Inspected Repaired] - Ran Levels |
|
May 03 2005
|
TCOON |
[Inspected Repaired] - Download log |
|
Apr 14 2005
|
TCOON |
[Inspected Repaired] - Download log |
|
Feb 09 2005
|
TCOON |
[Inspected Repaired] - Download log, replaced battery, reset DCP |
|
Jan 31 2005
|
TCOON |
[Inspected Repaired] - Replaced battery, Reset DCP |
|
Jan 03 2005
|
TCOON |
[Inspected Repaired] - Downloaded data |
|
Dec 27 2004
|
TCOON |
[Inspected Repaired] - Downloaded data, replace battery, reset dcp |
|
Dec 17 2004
|
TCOON |
[Inspected Repaired] - Downloaded data; checked backup batteries in CPU and Memory Board |
|
Nov 29 2004
|
TCOON |
[Inspected Repaired] - Replaced Aquatrak head and tube |
|
Nov 19 2004
|
TCOON |
[Inspected Repaired] - Battery replaced, downloaded data, DCP reset |
|
Oct 05 2004
|
TCOON |
[Inspected Repaired] - Download data, Tested sat boards w/ dummy load |
|
Jun 04 2004
|
TCOON |
[Inspected Repaired] - Replaced Battery |
|
May 26 2004
|
TCOON |
[Inspected Repaired] - Performed O&M |
|
May 25 2004
|
TCOON |
[Inspected Repaired] - Jet in 4x4x12's; brace up scaffolding |
|
May 17 2004
|
TCOON |
[Inspected Repaired] - DCP reset |
|
Feb 24 2004
|
TCOON |
[Inspected Repaired] - Ran Levels, damage recon. |
|
Jan 19 2004
|
TCOON |
[Inspected Repaired] - Cleared system check and GPIO error, download log |
|
Jan 05 2004
|
TCOON |
[Inspected Repaired] - Replaced Battery, Reset DCP |
|
Sep 24 2003
|
TCOON |
[Inspected Repaired] - reset DCP |
|
Jun 16 2003
|
TCOON |
[Inspected Repaired] - Reset DCP, Download log |
|
Apr 24 2003
|
TCOON |
[Inspected Repaired] - Download log, Change battery |
|
Apr 12 2003
|
TCOON |
[Inspected Repaired] - Reset DCP, Download log |
|
Apr 04 2003
|
TCOON |
[Inspected Repaired] - established comms thru Freewave |
|
Mar 05 2003
|
TCOON |
[Inspected Repaired] - Replaced battery, Download log |
|
Mar 04 2003
|
TCOON |
[Inspected Repaired] - Snaked sounding tube, cleared well |
|
Feb 27 2003
|
TCOON |
[Inspected Repaired] - Replaced battery |
|
Feb 11 2003
|
TCOON |
[Inspected Repaired] - Replaced battery |
|
Jan 31 2003
|
TCOON |
[Inspected Repaired] - Replaced battery |
|
Jan 24 2003
|
TCOON |
[Inspected] - download data |
|
Jan 14 2003
|
TCOON |
[Inspected] - Levels ran by TGLO |
|
Jan 05 2003
|
TCOON |
[Inspected Repaired] - Battery replaced |
|
Nov 04 2002
|
TCOON |
[Inspected Repaired] - replaced optima battery |
|
Oct 24 2002
|
TCOON |
[Inspected Repaired] - replaced optima battery |
|
Sep 09 2002
|
TCOON |
[Inspected Repaired] - replaced optima battery |
|
Jul 18 2002
|
TCOON |
[Inspected Repaired] - replaced cpu |
|
Jul 02 2002
|
TCOON |
[Inspected Repaired] - Corrected time |
|
Jun 10 2002
|
TCOON |
[Inspected] - correct time |
|
May 21 2002
|
TCOON |
[Inspected] - correct time |
|
Feb 13 2002
|
TCOON |
[Inspected] - Performed O & M. |
|
Feb 06 2002
|
TCOON |
[Repaired] - Replaced battery |
|
Feb 05 2002
|
TCOON |
[Inspected Repaired] - TGLO levels |
|
Jan 21 2002
|
TCOON |
[Repaired] - Replaced battery |
|
Dec 18 2001
|
TCOON |
[Inspected Repaired] - Replaced battery & downloaded log |
|
Dec 05 2001
|
TCOON |
[Inspected Repaired] - Replaced battery & downloaded log |
|
Oct 09 2001
|
TCOON |
[Inspected Repaired] - Reset DCP time, downloaded log |
|
Oct 02 2001
|
TCOON |
[Inspected Repaired] - Reset DCP time, downloaded log, install Cellphone and Freewave |
|
Aug 21 2001
|
TCOON |
[Inspected Repaired] - Reset DCP time, downloaded log |
|
Aug 06 2001
|
TCOON |
[Inspected Repaired] - Reset DCP time, downloaded log |
|
Aug 03 2001
|
TCOON |
[Inspected Repaired] - Reset DCP time, downloaded log |
|
Jul 24 2001
|
TCOON |
[Inspected Repaired] - Reset DCP time, downloaded log |
|
Jun 14 2001
|
TCOON |
[Inspected Repaired] - Reset DCP time, downloaded log |
|
Jun 01 2001
|
TCOON |
[Repaired] - Reset DCP time |
|
May 17 2001
|
TCOON |
[Repaired] - Changed satellite boards |
|
May 15 2001
|
TCOON |
[Repaired] - Adjusted loops |
|
Apr 23 2001
|
TCOON |
[Inspected Repaired] - Adjust loops, reset time |
|
Apr 02 2001
|
TCOON |
[Inspected Repaired] - DCP re-installed. |
|
Mar 15 2001
|
TCOON |
[Inspected Repaired] - DCP and Freeewave removed to CBI due to failure. |
|
Jan 23 2001
|
TCOON |
[Inspected Repaired] - Levels ran by TGLO |
|
Jan 15 2001
|
TCOON |
[Inspected Repaired] - Replaced battery, rewired solar panel directly to battery, installed regulator. |
|
Dec 27 2000
|
TCOON |
[Inspected Repaired] - Replaced battery |
|
Nov 15 2000
|
TCOON |
[Inspected Repaired] - Installed 30ft antenna mast for freewave, and tested radio comms-good results. |
|
Nov 13 2000
|
TCOON |
[Inspected Repaired] - downloaded log, replaced battery and battery cable. |
|
Sep 18 2000
|
TCOON |
[Inspected Repaired] - Installed Freewave radio 903-1521, changed EEPROM setting for modem, downloaded log. |
|
May 31 2000
|
TCOON |
[Inspected Repaired] - CBI - Ran levels and performed O&M |
|
Jan 06 2000
|
TCOON |
[Inspected Repaired] - Replaced cell phone and data jack. |
|
Dec 01 1999
|
TCOON |
[Inspected Repaired] - Changed software and modem settings. |
|
Oct 26 1999
|
TCOON |
[Repaired] - CBI - Adjusted satellite transmitter. |
|
Feb 25 1999
|
TCOON |
[Inspected] - Levels by TGLO |
|
Oct 05 1998
|
TCOON |
[Inspected] - Replace GPIO card.
|
|
Sep 30 1998
|
TCOON |
[Inspected] - Upgrade CPM to 1.13. |
|
Mar 03 1998
|
TCOON |
[Inspected] - Routine annual maintenance |
|
Sep 30 1997
|
TCOON |
[Repaired] - Installed new GOES antenna |
|
Sep 24 1997
|
TCOON |
[Repaired] - Gauge not transmiiting |
|
Sep 23 1997
|
TCOON |
[Repaired] - Gauge not transmiiting |
|
Sep 22 1997
|
TCOON |
[Repaired] - Gauge not transmiiting |
|
Sep 05 1997
|
TCOON |
[Repaired] - Cell phone not connecting |
|
May 01 1997
|
TCOON |
[Inspected] - Levels run by TGLO |
|
Apr 08 1997
|
TCOON |
[Inspected] - Routine leveling |
|
Apr 03 1997
|
TCOON |
[Inspected] - Routine maintenance |
|
Mar 03 1997
|
TCOON |
[Repaired] - |