Aug 24 2009 TCOON [Inspected Repaired] - Replace cal a, b and install wind
Feb 11 2009 TCOON [Repaired] - Repair to Ike Damage
Oct 10 2008 TCOON [Inspected] - Hurricans Ike Damage
Feb 28 2008 TCOON [Inspected] - TGLO Annual levels
Feb 07 2007 TCOON [Inspected] - TGLO levels
Jan 25 2007 TCOON [Inspected Repaired] - Replaced aquatrak
Jan 02 2007 TCOON [Inspected Repaired] - Replaced Cal A
Jun 06 2006 TCOON [Inspected Repaired] - Replaced Aquatrak and tube
Jun 01 2006 TCOON [Inspected Repaired] - Constructed pier, upgraded X-Dark
Feb 15 2006 TCOON [Inspected Repaired] - TGLO levels
Jan 10 2006 TCOON [Inspected Repaired] - Ran Levels
Aug 15 2005 TCOON [Established] - Installed new CMP Cycle 9 Platform
Aug 05 2005 TCOON [Inspected Repaired] - download log
Jul 08 2005 TCOON [Inspected Repaired] - reset time, download log
Jul 06 2005 TCOON [Inspected Repaired] - replaced battery, download log, reset dcp
Jun 02 2005 TCOON [Inspected Repaired] - Enter new c2, download log
May 24 2005 TCOON [Inspected Repaired] - Ran Levels
May 03 2005 TCOON [Inspected Repaired] - Download log
Apr 14 2005 TCOON [Inspected Repaired] - Download log
Feb 09 2005 TCOON [Inspected Repaired] - Download log, replaced battery, reset DCP
Jan 31 2005 TCOON [Inspected Repaired] - Replaced battery, Reset DCP
Jan 03 2005 TCOON [Inspected Repaired] - Downloaded data
Dec 27 2004 TCOON [Inspected Repaired] - Downloaded data, replace battery, reset dcp
Dec 17 2004 TCOON [Inspected Repaired] - Downloaded data; checked backup batteries in CPU and Memory Board
Nov 29 2004 TCOON [Inspected Repaired] - Replaced Aquatrak head and tube
Nov 19 2004 TCOON [Inspected Repaired] - Battery replaced, downloaded data, DCP reset
Oct 05 2004 TCOON [Inspected Repaired] - Download data, Tested sat boards w/ dummy load
Jun 04 2004 TCOON [Inspected Repaired] - Replaced Battery
May 26 2004 TCOON [Inspected Repaired] - Performed O&M
May 25 2004 TCOON [Inspected Repaired] - Jet in 4x4x12's; brace up scaffolding
May 17 2004 TCOON [Inspected Repaired] - DCP reset
Feb 24 2004 TCOON [Inspected Repaired] - Ran Levels, damage recon.
Jan 19 2004 TCOON [Inspected Repaired] - Cleared system check and GPIO error, download log
Jan 05 2004 TCOON [Inspected Repaired] - Replaced Battery, Reset DCP
Sep 24 2003 TCOON [Inspected Repaired] - reset DCP
Jun 16 2003 TCOON [Inspected Repaired] - Reset DCP, Download log
Apr 24 2003 TCOON [Inspected Repaired] - Download log, Change battery
Apr 12 2003 TCOON [Inspected Repaired] - Reset DCP, Download log
Apr 04 2003 TCOON [Inspected Repaired] - established comms thru Freewave
Mar 05 2003 TCOON [Inspected Repaired] - Replaced battery, Download log
Mar 04 2003 TCOON [Inspected Repaired] - Snaked sounding tube, cleared well
Feb 27 2003 TCOON [Inspected Repaired] - Replaced battery
Feb 11 2003 TCOON [Inspected Repaired] - Replaced battery
Jan 31 2003 TCOON [Inspected Repaired] - Replaced battery
Jan 24 2003 TCOON [Inspected] - download data
Jan 14 2003 TCOON [Inspected] - Levels ran by TGLO
Jan 05 2003 TCOON [Inspected Repaired] - Battery replaced
Nov 04 2002 TCOON [Inspected Repaired] - replaced optima battery
Oct 24 2002 TCOON [Inspected Repaired] - replaced optima battery
Sep 09 2002 TCOON [Inspected Repaired] - replaced optima battery
Jul 18 2002 TCOON [Inspected Repaired] - replaced cpu
Jul 02 2002 TCOON [Inspected Repaired] - Corrected time
Jun 10 2002 TCOON [Inspected] - correct time
May 21 2002 TCOON [Inspected] - correct time
Feb 13 2002 TCOON [Inspected] - Performed O & M.
Feb 06 2002 TCOON [Repaired] - Replaced battery
Feb 05 2002 TCOON [Inspected Repaired] - TGLO levels
Jan 21 2002 TCOON [Repaired] - Replaced battery
Dec 18 2001 TCOON [Inspected Repaired] - Replaced battery & downloaded log
Dec 05 2001 TCOON [Inspected Repaired] - Replaced battery & downloaded log
Oct 09 2001 TCOON [Inspected Repaired] - Reset DCP time, downloaded log
Oct 02 2001 TCOON [Inspected Repaired] - Reset DCP time, downloaded log, install Cellphone and Freewave
Aug 21 2001 TCOON [Inspected Repaired] - Reset DCP time, downloaded log
Aug 06 2001 TCOON [Inspected Repaired] - Reset DCP time, downloaded log
Aug 03 2001 TCOON [Inspected Repaired] - Reset DCP time, downloaded log
Jul 24 2001 TCOON [Inspected Repaired] - Reset DCP time, downloaded log
Jun 14 2001 TCOON [Inspected Repaired] - Reset DCP time, downloaded log
Jun 01 2001 TCOON [Repaired] - Reset DCP time
May 17 2001 TCOON [Repaired] - Changed satellite boards
May 15 2001 TCOON [Repaired] - Adjusted loops
Apr 23 2001 TCOON [Inspected Repaired] - Adjust loops, reset time
Apr 02 2001 TCOON [Inspected Repaired] - DCP re-installed.
Mar 15 2001 TCOON [Inspected Repaired] - DCP and Freeewave removed to CBI due to failure.
Jan 23 2001 TCOON [Inspected Repaired] - Levels ran by TGLO
Jan 15 2001 TCOON [Inspected Repaired] - Replaced battery, rewired solar panel directly to battery, installed regulator.
Dec 27 2000 TCOON [Inspected Repaired] - Replaced battery
Nov 15 2000 TCOON [Inspected Repaired] - Installed 30ft antenna mast for freewave, and tested radio comms-good results.
Nov 13 2000 TCOON [Inspected Repaired] - downloaded log, replaced battery and battery cable.
Sep 18 2000 TCOON [Inspected Repaired] - Installed Freewave radio 903-1521, changed EEPROM setting for modem, downloaded log.
May 31 2000 TCOON [Inspected Repaired] - CBI - Ran levels and performed O&M
Jan 06 2000 TCOON [Inspected Repaired] - Replaced cell phone and data jack.
Dec 01 1999 TCOON [Inspected Repaired] - Changed software and modem settings.
Oct 26 1999 TCOON [Repaired] - CBI - Adjusted satellite transmitter.
Feb 25 1999 TCOON [Inspected] - Levels by TGLO
Oct 05 1998 TCOON [Inspected] - Replace GPIO card.
Sep 30 1998 TCOON [Inspected] - Upgrade CPM to 1.13.
Mar 03 1998 TCOON [Inspected] - Routine annual maintenance
Sep 30 1997 TCOON [Repaired] - Installed new GOES antenna
Sep 24 1997 TCOON [Repaired] - Gauge not transmiiting
Sep 23 1997 TCOON [Repaired] - Gauge not transmiiting
Sep 22 1997 TCOON [Repaired] - Gauge not transmiiting
Sep 05 1997 TCOON [Repaired] - Cell phone not connecting
May 01 1997 TCOON [Inspected] - Levels run by TGLO
Apr 08 1997 TCOON [Inspected] - Routine leveling
Apr 03 1997 TCOON [Inspected] - Routine maintenance
Mar 03 1997 TCOON [Repaired] -