036: Copano Bay
Copano Bay, Texas
28° 6' 52" N   97° 1' 27" W
COPANO
87745131
 TCOON Site Visit Reports
Jan 1990-Mar 2010
updated 2010008+1949 by rperez
Jan 08 2010 TCOON [Repaired] - Installed a gps dome antenna and coax
Dec 18 2009 TCOON [Repaired] - Replaced water temp. and IP modem PRL to 3, was 1.
Aug 05 2009 TCOON [Repaired] - Replaced water temp and Aquatrak/cal tube.
Aug 04 2009 TCOON [Repaired] - Installed new enclosure and stand.
Jul 17 2009 TCOON [Inspected] - CBI level run.
Jul 15 2009 TCOON [Inspected] - Installed deep rod mark and ran levels
Jul 07 2009 TCOON [Inspected] - Recovered Tidal benchmark 4513 C.
Feb 10 2009 TCOON [Inspected] - TGLO Annual levels
Apr 03 2008 TCOON [Inspected] - TGLO Annual Levels
Feb 05 2008 TCOON [Repaired] - Replaced water temperature thermistor.
Jul 12 2007 TCOON [Established] - Upgrade to Sutron 9210 Xlite
Feb 22 2007 TCOON [Inspected] - TGLO Levels
Jun 15 2006 TCOON [Inspected] - Replaced Satellite Boards
Feb 09 2006 TCOON [Inspected] - TGLO levels
Mar 17 2005 TCOON [Inspected Repaired] - Replaced memory expansion module.
Jan 21 2005 TCOON [Inspected Repaired] - Performed O&M and Ran Levels.
Nov 08 2004 TCOON [Inspected] - New Plat ID
Jun 28 2004 TCOON [Inspected] - Reset DCP, initialized EEPROM.
May 18 2004 TCOON [Inspected] - TGLO levels
Jan 08 2004 TCOON [Repaired] - Replace Battery
Oct 23 2003 TCOON [Inspected Repaired] - Performed O&M and ran levels
Oct 22 2003 TCOON [Inspected Repaired] - Performed O&M and ran levels
Mar 07 2003 TCOON [Inspected Repaired] - Installed 12-8 Regulator
Mar 04 2003 TCOON [Inspected] - TGLO Levels
Mar 03 2003 TCOON [Inspected Repaired] - Replaced battery
Feb 27 2003 TCOON [Inspected Repaired] - Installed 2nd 30 watt solar panel
Jan 30 2003 TCOON [Inspected Repaired] - Replaced battery
Jan 13 2003 TCOON [Inspected Repaired] - Replaced battery
Dec 12 2002 TCOON [Inspected Repaired] - Replaced battery
May 21 2002 TCOON [Inspected Repaired] - Performed annual O&M and ran levels
Feb 06 2002 TCOON [Inspected Repaired] - Replaced Battery
Jan 16 2002 TCOON [] - Install Freewave
Jan 10 2002 TCOON [Inspected] - TGLO Level Run
May 09 2001 TCOON [Inspected Repaired] - Annual O&M; ran levels
Jan 19 2001 TCOON [Inspected Repaired] - Reset time
Jan 16 2001 TCOON [] - Install Freewave
May 24 2000 TCOON [Inspected Repaired] - Removed radio antenna and mast.
Jan 12 2000 TCOON [Inspected Repaired] - CBI & TGLO -- Annual O&M performed and levels run.
Nov 04 1999 TCOON [Inspected Repaired] - CBI -- Annual O&M performed and levels run.
Jul 22 1999 TCOON [Inspected] - Reset station
Jun 10 1999 TCOON [Inspected] - Levels run by TGLO.
Dec 02 1998 TCOON [Inspected] - Replaced station antenna, antenna mast, radio and TNC.
Aug 03 1998 TCOON [Inspected] - Replaced station battery and solar panel.
Jul 21 1998 TCOON [Inspected] - Replaced station battery and battery leads.
Feb 18 1998 TCOON [Inspected] - Ran levels.
Nov 21 1997 TCOON [Inspected] - Replace station battery.
Oct 27 1997 TCOON [Inspected] - Install JS1.1 software.
Aug 28 1997 TCOON [Inspected] - Data Download
Aug 15 1997 TCOON [Inspected] - Data Download
Aug 14 1997 TCOON [Inspected] - reset TNC
Aug 08 1997 TCOON [Inspected] - Changed desicant, verified sattelite transmission
Apr 15 1997 TCOON [Inspected] - Levels run by TGLO.
Oct 30 1996 TCOON [Repaired] - Tube clogged
Oct 29 1996 TCOON [Repaired] - Tube clogged
Sep 16 1996 TCOON [Inspected] - Leveling
Mar 12 1996 TCOON [Repaired] - Routine Maintenance
Jan 16 1996 TCOON [Inspected] -
Aug 02 1995 TCOON [Inspected] -
May 08 1995 TCOON [Inspected] -
Dec 06 1994 TCOON [Inspected] -
Oct 24 1994 TCOON [Inspected] -
Oct 17 1994 TCOON [Inspected] -
Jul 01 1994 TCOON [Repaired] - -->Needs Review: 10-21-93 <--
Feb 02 1994 TCOON [Inspected] - -->Needs Review: 12-2-93 <--
Jan 12 1994 TCOON [Inspected] - -->Needs Review: 8-13-93 <--
Dec 07 1992 TCOON [Repaired] - -->Needs Review: <--