Date Report Action(s) Summary
Jan 27 2016 WATER_LEVEL Inspected Annual Inspection
Feb 02 2015 WATER_LEVEL Inspected Bi-monthly inspection
Jan 29 2015 WATER_LEVEL Inspected Annual Inspection
Dec 04 2014 WATER_LEVEL Inspected Bi-monthly inspection
Oct 16 2014 WATER_LEVEL Inspected Bi-monthly inspection
Aug 08 2014 WATER_LEVEL Inspected Bi-monthly inspection
Jun 02 2014 WATER_LEVEL Inspected Bi-monthly inspection
Apr 04 2014 WATER_LEVEL Inspected Bi monthly inspection
Feb 03 2014 WATER_LEVEL Inspected bi monthly inspection
Jan 30 2014 WATER_LEVEL Inspected closing levels to temp station and annual inspection to permanent station
Dec 06 2013 WATER_LEVEL Inspected Bi-monthly inspection
Oct 03 2013 WATER_LEVEL Inspected Bi monthly inspection
Sep 05 2013 WATER_LEVEL Inspected Repaired Repaired well and ran levels
Sep 04 2013 WATER_LEVEL Inspected Repaired Levels to station prior to well repairs
Aug 07 2013 WATER_LEVEL Inspected Bi monthly inspection
Jul 30 2013 WATER_LEVEL Inspected Verification levels to aquatracs, Lowered T2 therm
Jun 05 2013 WATER_LEVEL Inspected Verification levels to new station, closing levels to temporary hydro.
Jun 03 2013 WATER_LEVEL Inspected bi-monthly inspection
Apr 02 2013 WATER_LEVEL Inspected Bi monthly inspection
Feb 07 2013 WATER_LEVEL Established Establishment of new station with levels
Dec 10 2012 WATER_LEVEL Inspected monthly inspection
Nov 15 2012 WATER_LEVEL Inspected Updated goes info
Nov 02 2012 WATER_LEVEL Inspected Monthly Inspection
Oct 01 2012 WATER_LEVEL Inspected Monthly Inspection
Sep 14 2012 WATER_LEVEL Inspected Monthly inspection
Aug 09 2012 WATER_LEVEL Inspected Monthly Inspection, replaced AI01 module
Jul 30 2012 WATER_LEVEL Inspected Monthly Inspection
Jun 07 2012 WATER_LEVEL Inspected Monthly Inspection
May 16 2012 WATER_LEVEL Inspected Monthly Inspection
Apr 05 2012 WATER_LEVEL Inspected Repaired Monthly Inspection
Mar 24 2012 WATER_LEVEL Repaired GOES id and transmit information updated.
Mar 23 2012 WATER_LEVEL Inspected Repaired dcp reset, new xgenerator files uploaded
Mar 06 2012 WATER_LEVEL Inspected Monthly Inspection
Jan 12 2012 WATER_LEVEL Inspected Monthly Inspection
Dec 08 2011 WATER_LEVEL Inspected Monthly Inspection
Nov 01 2011 WATER_LEVEL Inspected Monthly Inspection
Oct 13 2011 WATER_LEVEL Inspected Annual inspection with levels and GPS survey.
Oct 07 2011 WATER_LEVEL Inspected Monthly inspection
Sep 13 2011 WATER_LEVEL Inspected Monthly Inspection
Aug 02 2011 WATER_LEVEL Inspected Inspection
Jul 12 2011 WATER_LEVEL Inspected Monthly Inspection
Jun 13 2011 WATER_LEVEL Inspected Monthly Inspection
May 12 2011 PORTS Inspected Inspection
Apr 06 2011 PORTS Inspected Inspection
Mar 02 2011 PORTS Inspected Inspection
Feb 08 2011 PORTS Inspected Inspection
Jan 07 2011 PORTS Inspected Inspection
Dec 10 2010 PORTS Inspected Inspection
Nov 08 2010 Inspected Re-run GPS observation
Nov 04 2010 PORTS Inspected Inspection
Oct 19 2010 Inspected A&I performed with levels and GPS obs.
Oct 04 2010 PORTS Inspected Inspection
Sep 15 2010 PORTS Inspected Inspection
Aug 10 2010 PORTS Inspected Inspection
Jul 05 2010 PORTS Inspected Inspection
Jun 03 2010 PORTS Inspected Inspection
May 05 2010 PORTS Inspected Inspection
Apr 01 2010 PORTS Inspected Inspection
Mar 11 2010 PORTS Inspected Inspection
Feb 25 2010 PORTS Inspected Inspection
Jan 26 2010 PORTS Inspected Inspection
Dec 22 2009 PORTS Inspected Inspection
Nov 09 2009 PORTS Inspected Conducted Site Inspection
Oct 23 2009 Inspected Repaired Station components removed for demolition
Oct 15 2009 Inspected Repaired Closing levels before demolition
Oct 14 2009 Established Installation of temporary station
Jun 19 2009 PORTS Inspected Conducted Site Inspection
May 27 2009 PORTS Inspected Conducted Site Inspection
Apr 30 2009 PORTS Inspected Conducted Site Inspection
Feb 24 2009 PORTS Inspected Conducted Site Inspection
Dec 18 2008 PORTS Inspected Conducted Site Inspection
Dec 02 2008 Inspected Repaired re-install solar panel and replaced battery
Nov 25 2008 Inspected monthly inspection
Oct 28 2008 Inspected Repaired Replaced battery
Sep 18 2008 Inspected Repaired Replace Solar Panel
Sep 15 2008 Inspected Repaired Hurricane Ike Damage
Apr 01 2008 Inspected Repaired Annual A/I and levels
Nov 12 2007 Inspected Repaired Dive inspection
Sep 17 2007 PORTS Inspected Conducted Site Inspection
Jul 16 2007 PORTS Inspected Conducted Site Inspection
Jun 19 2007 PORTS Inspected Conducted Site Inspection
May 23 2007 PORTS Inspected Conducted Site Inspection
Apr 23 2007 PORTS Inspected Conducted Site Inspection
Mar 21 2007 PORTS Inspected Conducted Site Inspection
Mar 06 2007 Inspected Repaired Performed A/I and ran levels
Feb 22 2007 PORTS Inspected Conducted Site Inspection
Jan 26 2007 PORTS Inspected Conducted Site Inspection
Dec 20 2006 PORTS Inspected Conducted Site Inspection
Nov 21 2006 PORTS Inspected Conducted Site Inspection
Oct 30 2006 PORTS Inspected Conducted Site Inspection
Sep 28 2006 PORTS Inspected Conducted Site Inspection
Aug 21 2006 Repaired Replaced Nitrogen
Aug 19 2006 PORTS Inspected Conducted Site Inspection
Jul 24 2006 PORTS Inspected Conducted Site Inspection
Jun 26 2006 PORTS Inspected Conducted Site Inspection
Jun 21 2006 Inspected Repaired Upgrade DCP to Xpert/Xdark
May 30 2006 PORTS Inspected Conducted Site Inspection
Apr 28 2006 PORTS Inspected Conducted Site Inspection
Apr 06 2006 Inspected Repaired Reset DCP, cleared log
Mar 02 2006 PORTS Inspected Conducted Site Inspection
Feb 28 2006 Inspected Repaired Performed O&M, ran levels.
Feb 27 2006 PORTS Inspected Conducted Site Inspection
Jan 23 2006 PORTS Inspected Conducted Site Inspection
Dec 13 2005 PORTS Inspected Conducted Site Inspection
Nov 09 2005 PORTS Inspected Conducted Site Inspection
Oct 25 2005 PORTS Inspected Conducted Site Inspection
Sep 18 2005 PORTS Inspected Conducted Site Inspection
Aug 25 2005 Inspected Conducted Site Inspection
Aug 02 2005 Inspected Repaired replaced aquatrak board
Aug 01 2005 Inspected Repaired replaced term board
Jul 15 2005 Inspected Conducted Site Inspection
Jun 15 2005 PORTS Inspected Conducted Site Inspection
May 20 2005 PORTS Inspected Conducted Site Inspection
May 02 2005 Inspected Repaired Nitrogen cylinder replaced
Apr 13 2005 PORTS Inspected Conducted Site Inspection
Mar 16 2005 PORTS Inspected Conducted Site Inspection
Mar 01 2005 PORTS Inspected Conducted Site Inspection
Feb 16 2005 Inspected Repaired Performed O&M and Ran Levels.
Jan 19 2005 PORTS Inspected Conducted Site Inspection
Dec 20 2004 PORTS Inspected Conducted Site Inspection
Nov 18 2004 Inspected Repaired Replaced parallel plate assembly.
Nov 17 2004 PORTS Inspected Conducted Site Inspection
Oct 25 2004 Inspected Dive Inspection
Oct 25 2004 PORTS Inspected Conducted Site Inspection
Sep 22 2004 PORTS Inspected Conducted Site Inspection
Sep 15 2004 Inspected Repaired Nitrogen cylinder replaced
Sep 07 2004 Inspected Repaired Cleared Com CPU 255 error, download log
Aug 17 2004 PORTS Inspected Conducted Site Inspection
Jul 28 2004 PORTS Inspected Conducted Site Inspection
Jul 16 2004 PORTS Inspected Repaired Reset radio
Jun 16 2004 PORTS Inspected Conducted Site Inspection
Jun 12 2004 PORTS Inspected Repaired Snaked sounding tube
May 24 2004 PORTS Inspected Conducted Site Inspection
Apr 13 2004 PORTS Inspected Conducted Site Inspection
Feb 11 2004 Inspected Repaired Performed O&M and Ran Levels
Jan 29 2004 PORTS Inspected Conducted Site Inspection
Dec 23 2003 PORTS Inspected Conducted Site Inspection
Nov 14 2003 PORTS Inspected Conducted Site Inspection
Oct 27 2003 PORTS Inspected Repaired Reset PORTS Radio
Oct 24 2003 PORTS Inspected Conducted Site Inspection
Oct 16 2003 PORTS Inspected Redirect Radio Antenna
Oct 10 2003 Inspected Repaired Replaced Battery, Reset DCP
Sep 24 2003 PORTS Inspected Conducted Site Inspection
Aug 20 2003 PORTS Inspected Conducted Site Inspection
Jul 22 2003 PORTS Inspected Conducted Site Inspection
Jun 19 2003 PORTS Inspected Reset PORTS radio, Replaced PORTS radio
Jun 16 2003 Inspected Repaired Reset DCP, Download log
Jun 16 2003 PORTS Inspected Reset PORTS radio
Jun 04 2003 PORTS Inspected Conducted Site Inspection
May 16 2003 PORTS Inspected Conducted Inspection
Apr 23 2003 PORTS Inspected Conducted Inspection
Apr 14 2003 Inspected Repaired Changed Nitrogen and Regulator
Mar 19 2003 PORTS Inspected Conducted Inspection
Mar 03 2003 PORTS Inspected Repaired Reset PORTS radio
Feb 19 2003 PORTS Inspected conducted site inspection
Jan 21 2003 PORTS Inspected conducted site inspection
Jan 07 2003 Inspected Repaired O & M
Dec 16 2002 PORTS Inspected conducted site inspection
Nov 05 2002 PORTS Inspected conducted site inspection
Oct 23 2002 Inspected Repaired Install two deep rod 3D marks
Oct 16 2002 Inspected Repaired replaced termination board
Oct 09 2002 Inspected Repaired replaced nitrogen cylinder
Oct 07 2002 PORTS Inspected conducted site inspection
Sep 18 2002 PORTS Inspected Repaired reset Ports radio
Sep 12 2002 PORTS Inspected Conducted site inspection
Aug 13 2002 PORTS Inspected Conducted site inspection
Jul 11 2002 Inspected Repaired performed inspection changed sat and comm boards
Jul 11 2002 PORTS Inspected Repaired performed inspection changed sat and comm boards
May 28 2002 PORTS Inspected site inspection
Apr 22 2002 PORTS Inspected reset radio
Apr 11 2002 PORTS Inspected Conducted inspection
Mar 19 2002 PORTS Inspected Conducted inspection
Feb 12 2002 PORTS Inspected Conducted inspection
Dec 05 2001 Inspected Repaired Performed annual O&M and ran levels
Nov 27 2001 Inspected Repaired Replaced CPU & Nitrogen cylinder
Nov 09 2001 PORTS Inspected Reset radio
Oct 30 2001 PORTS Inspected Reset radio
Oct 09 2001 PORTS Inspected Reset radio
Aug 04 2001 Inspected Repaired Cycle power on radio
Jul 26 2001 Inspected Repaired Cycle power on radio
Jan 09 2001 PORTS Inspected Conducted inspection
Mar 31 2000 Inspected Repaired CBI - Ran Levels and performed O&M.
Sep 03 1999 Inspected Repaired replaced Nitrogen bottle
Jun 15 1999 Inspected Adjust Sat transmitter
Mar 16 1999 Inspected Ping test
Feb 05 1999 Inspected Levelled
Jan 21 1999 Inspected Replaced battery
Dec 09 1998 Inspected Renewed gas and dessicant
Feb 17 1998 Inspected Routine annual maintenance
Nov 10 1997 Repaired Turn 8200 recorder on
Oct 08 1997 Repaired Replaced nitrogen for 8200
Sep 12 1997 Repaired Replaced ports radio pac-com
Sep 11 1997 Repaired Ports radio not working correctly
Aug 15 1997 Inspected Clean stilling well
May 07 1997 Repaired Installed new 8200 battery and upgraded SDL Ver JS1.11
Apr 16 1997 Repaired Install new power supply board
Dec 13 1996 Inspected Completed scheduled observation and maintenance work.