018: Port Isabel
Brownsville, Texas
26° 3' 40" N   97° 12' 55" W
PTISAB
87797701
National Oceanic and Atmospheric Administration (NOAA)
National Water Level Observation Network (NWLON)
NOAA

Site Visit Reports
Jan 1990-Aug 2020
updated 2015306+1933 by zhasdorff
Date Report Action(s) Summary
Oct 20 2015 WATER_LEVEL Inspected Annual Inspection
Jan 09 2015 WATER_LEVEL Repaired replaced battery and waterlogger
Dec 19 2014 WATER_LEVEL Repaired replaced solar panel and waterlogger
Oct 22 2014 WATER_LEVEL Inspected annual inspection
Oct 21 2014 WATER_LEVEL Inspected Dive inspection
May 14 2014 WATER_LEVEL Repaired Replaced Druck and Brass pieces to correct BWL issues
Apr 24 2014 WATER_LEVEL Repaired Replaced waterlogger and Cal A thermistor
Nov 13 2013 WATER_LEVEL Repaired Replaced cal b and waterlog pump
Oct 15 2013 WATER_LEVEL Inspected Repaired Annual Inspection
Jun 11 2013 WATER_LEVEL Repaired Replaced IP modem and water logger / Druck
Oct 29 2012 WATER_LEVEL Inspected Annual Inspection.
Dec 06 2011 WATER_LEVEL Repaired Replaced Aqt head/tube, replaced entire sounding tube kit, ping test.
Nov 11 2011 WATER_LEVEL Repaired Replaced aquatrak controller and head/tube.
Oct 17 2011 WATER_LEVEL Established Relocation of station. Levels to three benchmarks and spsn 1807 (old) to close out old station; spsn 1808 (new) to open new station.
Feb 07 2011 Repaired Replaced/Relocated GPS antenna.
Jan 13 2011 Inspected AI performed.
Jan 07 2011 Inspected Replaced head and tube; level run performed.
Dec 19 2009 Repaired Replaced batteries and Cylinder
May 07 2009 Repaired Replaced water temperature thermistor.
Feb 18 2009 Repaired Restore coms and replace nitrogen BWL
Jan 09 2009 Repaired Replaced water temp thermistor.
Dec 26 2008 Repaired Upgrade NOS.sll
Oct 23 2008 Repaired Replaced nitrogen cylinder and left spare.
Aug 14 2008 Inspected Repaired Performed A/I and ran levels
Feb 19 2008 Inspected Repaired Replace GPS antenna, Cal Baro
Jan 25 2008 Inspected Repaired Replaced battery & refilled nitrogen cylinder.
May 22 2007 Inspected Repaired annual levels and A/I
Dec 06 2006 Inspected Repaired Fixed modem problem, installed loop current regulator.
Jun 26 2006 Inspected Repaired
May 10 2006 Inspected Repaired Replaced Sat boards, download log
Feb 03 2006 Inspected Repaired Added 2nd 30w solar panel & replaced battery
Jan 24 2006 Inspected Repaired Retrieved 8200 log; replaced solar panel and battery
Dec 23 2005 Repaired Replaced battery, sat boards, antenna
Dec 05 2005 Repaired Replaced battery, reset DCP
Oct 27 2005 Repaired Replaced battery; replaced nitrogen cylinder
Sep 08 2005 Repaired Reset DCP; changed out battery
Jul 18 2005 Inspected Change AQT head/tube, change battery, clear log
Jul 15 2005 Inspected Clean Sounding tube/replace AQ board
Jun 23 2005 Inspected Repaired Performed O&M, ran levels.
Jan 12 2005 Inspected Repaired Replaced Nitrogen cylinder
May 11 2004 Inspected Repaired Performed O&M and Ran Levels.
Aug 19 2003 Inspected Repaired Replaced Nitrogen cylinder
May 08 2003 Inspected Repaired Replaced GPIO module and 8200 main battery.
Apr 01 2003 Inspected Repaired Performed O&M and Ran Levels.
Mar 03 2003 Inspected Repaired Reinitialize DCP
Jan 28 2003 Inspected Repaired Download log, Reinitialize DCP, fix lan line
Nov 14 2002 Inspected Repaired Re-initialized DCP.
Oct 15 2002 Inspected Repaired Replaced nitrogen cylinder
Mar 26 2002 Inspected Repaired Replaced battery in 8200
Jan 09 2002 Inspected Repaired Performed annual O&M and ran levels.
Oct 11 2001 Inspected Repaired Replaced battery in 8200
Aug 09 2001 Inspected Repaired Repaired air thermistor
May 04 2000 Inspected Repaired Replaced GPIO module.
Mar 15 2000 Inspected Repaired Annual maintenance and levels
Mar 02 2000 Inspected Repaired Installed wind sensor and mast,air temp,and barometer
Feb 10 2000 Inspected Repaired Installed new door handle, vacuumed
Sep 22 1999 Inspected Repaired Upgrade software to JS1.14
Jan 27 1999 Inspected Repaired Changed software, replaced cpu and main memory board batteries.
Aug 27 1998 Inspected O&M and run levels
Nov 13 1997 Inspected Replace power supply, modem boards and battery
Sep 23 1997 Inspected Ran levels
Sep 03 1997 Repaired R & R boards
Aug 25 1997 Repaired R & R sat boards
Aug 05 1997 Inspected Repaired O & M, Repair backup
May 07 1997 Inspected Ran levels
Jan 30 1997 Repaired Installed new modem board, and Rev HT+, and 2.5F
Jan 23 1997 Repaired Replace Satellite & CPU Boards, Antenna, Coax and Software.
Jan 16 1997 Repaired Replace Satellite Boards
Dec 27 1996 Repaired Replace Satellite transmitter boards
Nov 04 1996 Repaired Adjust Satellite Transmitter
Nov 02 1996 Repaired upgraded software
Jun 06 1996 Inspected Survey levels & memory/software change
Dec 12 1995 Repaired