Feb 22 2010
|
|
[Inspected] - Monthly Inspection |
|
Jan 06 2010
|
TCOON |
[Inspected Repaired] - replaced ip modem |
|
Nov 11 2009
|
TCOON |
[Inspected Repaired] - replaced wind sensor |
|
Nov 02 2009
|
TCOON |
[Inspected Repaired] - Annual AI with levels and GPS survey |
|
Apr 09 2009
|
TCOON |
[Inspected Repaired] - AI and levels. |
|
Jan 08 2009
|
TCOON |
[Repaired] - Replace WTP, Install DNR Modem |
|
Dec 29 2008
|
TCOON |
[Inspected Repaired] - Replaced battery |
|
Nov 06 2008
|
TCOON |
[Inspected] - Verify aquatrak sensor offset |
|
Sep 17 2008
|
TCOON |
[Repaired] - Hurricane Ike Damage. |
|
Nov 28 2007
|
TCOON |
[Inspected Repaired] - Annual A/I and ran levels |
|
Jun 21 2007
|
TCOON |
[Inspected Repaired] - Replaced digital module |
|
Dec 19 2006
|
TCOON |
[Inspected] - Closing levels for temporary station |
|
Dec 05 2006
|
TCOON |
[Inspected] - Ran levels to new station. |
|
Nov 28 2006
|
TCOON |
[Established] - Installed new station. |
|
Sep 19 2006
|
TCOON |
[Inspected Repaired] - Levels |
|
Jan 26 2006
|
TCOON |
[Inspected Repaired] - Replaced Aquatrak |
|
Dec 12 2005
|
TCOON |
[Inspected Repaired] - Replaced Aquatrak |
|
Oct 05 2005
|
TCOON |
[Inspected Repaired] - Corrected power connection to Satlink |
|
Sep 28 2005
|
TCOON |
[Established Inspected] - Established temporary station |
|
Sep 27 2005
|
TCOON |
[Inspected Removed] - Station destroyed by Hurricane Rita |
|
Apr 11 2005
|
TCOON |
[Inspected Repaired] - Inspected aquatrak, downloaded data |
|
Apr 01 2005
|
TCOON |
[Inspected Repaired] - WTP and Aquatraq replaced |
|
Mar 25 2005
|
TCOON |
[Inspected Repaired] - Replaced nitrogen cylinder |
|
Mar 23 2005
|
TCOON |
[Inspected] - Install wind sensor |
|
Oct 25 2004
|
TCOON |
[Inspected] - Dive inspection |
|
Sep 29 2004
|
TCOON |
[Inspected Repaired] - Performed O&M and Ran Levels. |
|
Aug 11 2004
|
TCOON |
[Inspected Repaired] - Reset CPU Clock, DCP |
|
Jun 22 2004
|
TCOON |
[Inspected Repaired] - Cleared sounding tube; replaced o-ring on dry imo |
|
Apr 20 2004
|
TCOON |
[Inspected Repaired] - Replaced Nitrogen |
|
Dec 09 2003
|
TCOON |
[Inspected Repaired] - Replaced O-ring on Dry IMO |
|
Oct 30 2003
|
TCOON |
[Inspected Repaired] - Replaced O-ring on Dry IMO; purged back-up |
|
Oct 08 2003
|
TCOON |
[Inspected Repaired] - Changed Nitrogen Cylinder |
|
Oct 01 2003
|
TCOON |
[Inspected Repaired] - Performed O&M and Ran Levels. |
|
Jul 24 2003
|
TCOON |
[Inspected Repaired] - Reset time, Enable GOES |
|
Oct 22 2002
|
TCOON |
[] - Install two 3D marks Along abutment |
|
Aug 07 2002
|
TCOON |
[Inspected Repaired] - Performed O&M and Ran Levels |
|
Feb 06 2002
|
TCOON |
[Repaired] - Replaced Sat Coax and downloaded log. |
|
Jan 24 2002
|
TCOON |
[Repaired] - Replace DCP, and Battery |
|
Jan 09 2002
|
TCOON |
[Repaired] - Replace Sat Boards |
|
Jan 07 2002
|
TCOON |
[Repaired] - Replace CPU |
|
Jan 03 2002
|
TCOON |
[Inspected] - Attempted to repair DCP |
|
Dec 27 2001
|
TCOON |
[Inspected] - replaced board batteries and main battery |
|
Dec 03 2001
|
TCOON |
[] - replace nitrogen cylinder |
|
Oct 02 2001
|
TCOON |
[Inspected] - Downloaded log |
|
Jun 01 2001
|
TCOON |
[Inspected Repaired] - Downloaded log |
|
Feb 13 2001
|
TCOON |
[Inspected] - Performed Annual O&M. |
|
Jan 07 2001
|
TCOON |
[Repaired] - mistakenly used wrong year |
|
Nov 30 2000
|
TCOON |
[Inspected] - Replaced Nitrogen bottle. |
|
Nov 09 2000
|
TCOON |
[Inspected] - Downloaded log. |
|
Jan 04 2000
|
TCOON |
[Inspected] - CBI - Replaced nitrogen bottle, inspected telephone line. |
|
Jan 31 1999
|
TCOON |
[Inspected] - Annual maintenance performed and levels run by Lamar. |
|
Oct 30 1998
|
TCOON |
[Inspected] - Reload system software |
|
Oct 14 1998
|
TCOON |
[Repaired] - Replaced Sutron boards |
|
Sep 16 1998
|
TCOON |
[Repaired] - Repaired aquatrak connection |
|
Mar 23 1998
|
TCOON |
[Inspected] - Cleaned stilling well |
|
Mar 17 1998
|
TCOON |
[Inspected] - Phone line not connecting, reset gauge |
|
Feb 20 1998
|
TCOON |
[Inspected] - Routine annual maintenance |
|
Dec 15 1997
|
TCOON |
[Repaired] - Phone line not connecting, rewire phone line in gauge |
|
Nov 19 1997
|
TCOON |
[Repaired] - Install new water temperature sensor, replace 8200 nitrogen tank |
|
Aug 28 1997
|
TCOON |
[Inspected] - Clean stilling well |
|
May 06 1997
|
TCOON |
[Inspected] - Check aquatrak elevation and upgrade SDL |
|
May 03 1997
|
TCOON |
[Inspected Repaired] - Fixed leak in Druck sensor |
|
Dec 21 1996
|
TCOON |
[Repaired] - Replaced satellite transmitter & comm cpu |
|
Dec 14 1996
|
TCOON |
[Inspected] - O&M |