Site Visit Summaries
20 Mar 2010 15:59 UTC 2010079+15:59 UTC

Overview Datums Bench Marks Data Query Site Visit Daily QC Messages Attributes

016: Sabine Pass
Sabine River, Texas
29° 43' 47" N   93° 52' 15" W
SABINE
87705701
National Oceanic and Atmospheric Administration
National Water Level Observation Network
NOAA
 TCOON Site Visit Reports
Jan 1990-Mar 2010
updated 2010054+2143 by amendoza
Feb 22 2010 [Inspected] - Monthly Inspection
Jan 06 2010 TCOON [Inspected Repaired] - replaced ip modem
Nov 11 2009 TCOON [Inspected Repaired] - replaced wind sensor
Nov 02 2009 TCOON [Inspected Repaired] - Annual AI with levels and GPS survey
Apr 09 2009 TCOON [Inspected Repaired] - AI and levels.
Jan 08 2009 TCOON [Repaired] - Replace WTP, Install DNR Modem
Dec 29 2008 TCOON [Inspected Repaired] - Replaced battery
Nov 06 2008 TCOON [Inspected] - Verify aquatrak sensor offset
Sep 17 2008 TCOON [Repaired] - Hurricane Ike Damage.
Nov 28 2007 TCOON [Inspected Repaired] - Annual A/I and ran levels
Jun 21 2007 TCOON [Inspected Repaired] - Replaced digital module
Dec 19 2006 TCOON [Inspected] - Closing levels for temporary station
Dec 05 2006 TCOON [Inspected] - Ran levels to new station.
Nov 28 2006 TCOON [Established] - Installed new station.
Sep 19 2006 TCOON [Inspected Repaired] - Levels
Jan 26 2006 TCOON [Inspected Repaired] - Replaced Aquatrak
Dec 12 2005 TCOON [Inspected Repaired] - Replaced Aquatrak
Oct 05 2005 TCOON [Inspected Repaired] - Corrected power connection to Satlink
Sep 28 2005 TCOON [Established Inspected] - Established temporary station
Sep 27 2005 TCOON [Inspected Removed] - Station destroyed by Hurricane Rita
Apr 11 2005 TCOON [Inspected Repaired] - Inspected aquatrak, downloaded data
Apr 01 2005 TCOON [Inspected Repaired] - WTP and Aquatraq replaced
Mar 25 2005 TCOON [Inspected Repaired] - Replaced nitrogen cylinder
Mar 23 2005 TCOON [Inspected] - Install wind sensor
Oct 25 2004 TCOON [Inspected] - Dive inspection
Sep 29 2004 TCOON [Inspected Repaired] - Performed O&M and Ran Levels.
Aug 11 2004 TCOON [Inspected Repaired] - Reset CPU Clock, DCP
Jun 22 2004 TCOON [Inspected Repaired] - Cleared sounding tube; replaced o-ring on dry imo
Apr 20 2004 TCOON [Inspected Repaired] - Replaced Nitrogen
Dec 09 2003 TCOON [Inspected Repaired] - Replaced O-ring on Dry IMO
Oct 30 2003 TCOON [Inspected Repaired] - Replaced O-ring on Dry IMO; purged back-up
Oct 08 2003 TCOON [Inspected Repaired] - Changed Nitrogen Cylinder
Oct 01 2003 TCOON [Inspected Repaired] - Performed O&M and Ran Levels.
Jul 24 2003 TCOON [Inspected Repaired] - Reset time, Enable GOES
Oct 22 2002 TCOON [] - Install two 3D marks Along abutment
Aug 07 2002 TCOON [Inspected Repaired] - Performed O&M and Ran Levels
Feb 06 2002 TCOON [Repaired] - Replaced Sat Coax and downloaded log.
Jan 24 2002 TCOON [Repaired] - Replace DCP, and Battery
Jan 09 2002 TCOON [Repaired] - Replace Sat Boards
Jan 07 2002 TCOON [Repaired] - Replace CPU
Jan 03 2002 TCOON [Inspected] - Attempted to repair DCP
Dec 27 2001 TCOON [Inspected] - replaced board batteries and main battery
Dec 03 2001 TCOON [] - replace nitrogen cylinder
Oct 02 2001 TCOON [Inspected] - Downloaded log
Jun 01 2001 TCOON [Inspected Repaired] - Downloaded log
Feb 13 2001 TCOON [Inspected] - Performed Annual O&M.
Jan 07 2001 TCOON [Repaired] - mistakenly used wrong year
Nov 30 2000 TCOON [Inspected] - Replaced Nitrogen bottle.
Nov 09 2000 TCOON [Inspected] - Downloaded log.
Jan 04 2000 TCOON [Inspected] - CBI - Replaced nitrogen bottle, inspected telephone line.
Jan 31 1999 TCOON [Inspected] - Annual maintenance performed and levels run by Lamar.
Oct 30 1998 TCOON [Inspected] - Reload system software
Oct 14 1998 TCOON [Repaired] - Replaced Sutron boards
Sep 16 1998 TCOON [Repaired] - Repaired aquatrak connection
Mar 23 1998 TCOON [Inspected] - Cleaned stilling well
Mar 17 1998 TCOON [Inspected] - Phone line not connecting, reset gauge
Feb 20 1998 TCOON [Inspected] - Routine annual maintenance
Dec 15 1997 TCOON [Repaired] - Phone line not connecting, rewire phone line in gauge
Nov 19 1997 TCOON [Repaired] - Install new water temperature sensor, replace 8200 nitrogen tank
Aug 28 1997 TCOON [Inspected] - Clean stilling well
May 06 1997 TCOON [Inspected] - Check aquatrak elevation and upgrade SDL
May 03 1997 TCOON [Inspected Repaired] - Fixed leak in Druck sensor
Dec 21 1996 TCOON [Repaired] - Replaced satellite transmitter & comm cpu
Dec 14 1996 TCOON [Inspected] - O&M
Page last modified on May 15, 2009, at 10:09 AM