Oct 20 2009
|
[Inspected] - Annual Inspection and level run. |
|
Dec 15 2008
|
[Repaired] - Corrected Bartek settings |
|
Dec 13 2008
|
[Repaired] - |
|
Dec 04 2008
|
[Repaired] - Installed new IP modem. |
|
Nov 03 2008
|
[Inspected] - Annual Inspection and levels run. |
|
Feb 22 2008
|
[Repaired] - Replaced Aquatrak controller. |
|
Dec 07 2007
|
[Repaired] - Replaced water temperature thermistor |
|
Jul 24 2007
|
[Established] - Upgrade, A/I, and annual levels |
|
Aug 25 2006
|
[Inspected] - O&M and Annual levels |
|
Aug 24 2006
|
[Inspected] - Annual Levels |
|
Aug 10 2006
|
[Inspected Repaired] - Replaced AQT Head/tube |
|
Jul 06 2006
|
[Inspected Repaired] - Replaced AQT Head/Tube & water therm |
|
Aug 25 2005
|
[Inspected Repaired] - Run Levels |
|
Aug 23 2005
|
[Inspected Repaired] - Perform O&M |
|
Mar 17 2005
|
[Inspected Repaired] - Replaced O-ring on Druck. |
|
Nov 19 2004
|
[Inspected Repaired] - Replaced Aquatrak head & tube |
|
Sep 22 2004
|
[Inspected Repaired] - Performed O&M and Ran Levels. |
|
Oct 23 2003
|
[Inspected Repaired] - Replaced Nitrogen cylinder |
|
Aug 27 2003
|
[Inspected Repaired] - Performed O&M and Ran Levels. |
|
Jul 17 2003
|
[Inspected Repaired] - Replaced Nitrogen cylinder |
|
Feb 27 2003
|
[Inspected Repaired] - Install Dry manifold 8200 |
|
Feb 18 2003
|
[Inspected Repaired] - Purged 8200 |
|
Jan 30 2003
|
[Inspected Repaired] - Purged 8200 |
|
Jan 13 2003
|
[Inspected Repaired] - Purged 8200 |
|
Oct 01 2002
|
[Inspected Repaired] - Performed O&M and Ran Levels. |
|
Jul 29 2002
|
[Inspected Repaired] - Reset DCP |
|
Apr 15 2002
|
[Repaired] - Leak in Druck detected, problem corrected. |
|
Mar 21 2002
|
[Repaired] - Leak in Druck detected, problem corrected. |
|
Mar 12 2002
|
[Inspected] - clean well and BWL orifice |
|
Mar 05 2002
|
[Inspected] - Purge BWL line and adjust flow volume |
|
Dec 06 2001
|
[Inspected Repaired] - Replace Nitrogen Cylinder |
|
Nov 01 2001
|
[Inspected Repaired] - Run levels & Annual O&M |
|
Apr 18 2001
|
[Inspected] - Replace Aquatrac Head and Tube |
|
Mar 22 2001
|
[Inspected] - Snake Tube: Download data |
|
Oct 04 2000
|
[Inspected] - CBI - Run Levels, Annual O&M |
|
Jan 19 2000
|
[Inspected] - CBI - Run Levels |
|
Jan 18 2000
|
[Inspected] - CBI - Run Levels |
|
Sep 13 1999
|
[Inspected Repaired] - Performed O/M |
|
Sep 09 1999
|
[Inspected] - Confirmation Levels Run. |
|
Sep 03 1999
|
[Inspected] - Levels were performed. |
|
Oct 29 1998
|
[Inspected Repaired] - Adjusted loops on satellite transmitter. |
|
Sep 14 1998
|
[Inspected Repaired] - Replace lower air thermister and cabling. |
|
Apr 22 1998
|
[Inspected] - O&M Annual maintenance
|
|
Apr 21 1998
|
[Inspected] - O&M |
|
Oct 06 1997
|
[Inspected] - Install new battery, install new software. |
|
Apr 09 1997
|
[Inspected] - Install new battery |
|
Mar 20 1997
|
[Inspected] - Completed O&M |