|
Dec 14 2009
|
TCOON |
[Inspected] - Installed Raven XT modem |
|
Mar 10 2009
|
TCOON |
[Inspected] - TGLO Annual Levels |
|
Apr 24 2008
|
TCOON |
[Inspected] - TGLO Annual Levels |
|
Apr 08 2008
|
TCOON |
[Repaired] - Replace Vitel |
|
Feb 12 2008
|
TCOON |
[Repaired] - Jetted out well. |
|
Jun 20 2007
|
TCOON |
[Repaired] - Jetted out well. |
|
Jun 18 2007
|
TCOON |
[Repaired] - Reset GOES info, downloaded log |
|
Mar 21 2007
|
TCOON |
[Inspected] - TGLO Levels |
|
Jan 18 2007
|
TCOON |
[Inspected Repaired] - Replaced battery,installed IP modem |
|
May 09 2006
|
TCOON |
[Inspected] - TGLO levels |
|
Feb 02 2006
|
TCOON |
[Inspected Repaired] - Performed O&M & Ran Levels |
|
Dec 21 2005
|
TCOON |
[Inspected Repaired] - Replaced battery |
|
Aug 26 2005
|
TCOON |
[Inspected Repaired] - Jetted out well |
|
Jun 15 2005
|
TCOON |
[Inspected Repaired] - Jetted out well |
|
Mar 01 2005
|
TCOON |
[Inspected Repaired] - Jetted out well & snaked sounding tube |
|
Feb 08 2005
|
TCOON |
[Inspected Repaired] - Batteries replaced |
|
Jan 28 2005
|
TCOON |
[Inspected Repaired] - Installed new Yagi Antenna and RG8 coax |
|
Jan 25 2005
|
TCOON |
[Inspected Repaired] - Levels run by TGLO. |
|
Jul 29 2004
|
TCOON |
[Inspected Repaired] - Reset freewave; reoriented yagi antenna |
|
Jun 14 2004
|
TCOON |
[Inspected Repaired] - Jetted out well. |
|
Apr 01 2004
|
TCOON |
[Inspected Repaired] - Performed O&M and Ran Levels |
|
Aug 12 2003
|
TCOON |
[Repaired] - Added a new solar panel |
|
Jul 14 2003
|
TCOON |
[Inspected Repaired] - Replaced batteries |
|
Jun 30 2003
|
TCOON |
[Inspected Repaired] - Reinstalled PA & motherboard |
|
Jun 27 2003
|
TCOON |
[Inspected Repaired] - Removed PA |
|
Jun 26 2003
|
TCOON |
[Inspected Repaired] - Reinstalled another Vitel 1100 |
|
Jun 24 2003
|
TCOON |
[Inspected Repaired] - Replaced Aquatrak head/tube |
|
Jun 23 2003
|
TCOON |
[Inspected Repaired] - Replaced batteries |
|
Jun 12 2003
|
TCOON |
[Inspected Repaired] - Replaced DCP. |
|
Apr 21 2003
|
TCOON |
[Inspected] - Removed Power Amp. |
|
Mar 05 2003
|
TCOON |
[Inspected] - TGLO levels |
|
Feb 05 2003
|
TCOON |
[Established] - Re-Installed Vitel 1100; jetted well out |
|
Jan 24 2002
|
TCOON |
[Removed] - Removed Sutron |
|
Nov 07 2001
|
TCOON |
[Inspected] - TGLO levels |
|
Sep 06 2001
|
TCOON |
[] - New lease owner |
|
Aug 01 2001
|
TCOON |
[Inspected Repaired] - Jetted out well |
|
May 02 2001
|
TCOON |
[Inspected Repaired] - Completed O&M, installed modem board. |
|
Apr 23 2001
|
TCOON |
[Repaired] - Replace wind sensor, Begin O&M |
|
Sep 08 2000
|
TCOON |
[Repaired] - CBI - Jetted well |
|
May 01 2000
|
TCOON |
[Repaired] - Changed CPU Module |
|
Apr 20 2000
|
TCOON |
[Repaired] - Re-installed Sutron |
|
Apr 18 2000
|
TCOON |
[Repaired] - Removed RTU to CBI lab |
|
Jan 20 2000
|
TCOON |
[Repaired] - repaired thermisters. |
|
Jan 11 2000
|
TCOON |
[Inspected Repaired] - TGLO Levels |
|
Dec 13 1999
|
TCOON |
[Inspected Repaired] - CBI - Levels run and annual O&M performed. |
|
Oct 25 1999
|
TCOON |
[Repaired] - CBI -- replaced aquatrak |
|
Jun 08 1999
|
TCOON |
[Inspected] - Levels run by TGLO survey crew |
|
Feb 01 1999
|
TCOON |
[Inspected Repaired] - Replaced wind sensor, repaired lock |
|
Jan 20 1999
|
TCOON |
[Inspected Repaired] - CBI - Levels run and annual O&M performed. |
|
Oct 28 1998
|
TCOON |
[Inspected] - Ran levels. |
|
Feb 19 1998
|
TCOON |
[Inspected] - Ran levels for TGLO. |
|
Jan 12 1998
|
TCOON |
[Inspected Repaired] - Adjusted Loops 1&2 |
|
Dec 18 1997
|
TCOON |
[Inspected Repaired] - Extended protective well and sounding tube. |
|
Sep 29 1997
|
TCOON |
[Inspected Repaired] - Installed 100 Kohm resistor in GPIO term board |
|
Sep 16 1997
|
TCOON |
[Inspected Repaired] - Replaced aquatrack head and cal tube. |
|
Jul 24 1997
|
TCOON |
[Inspected] - Ran levels. |
|
Apr 21 1997
|
TCOON |
[Repaired] - Replaced aquatrak sensor cable |
|
Apr 17 1997
|
TCOON |
[Inspected Repaired] - Reset TNC
|
|
Aug 02 1996
|
TCOON |
[Inspected] - Routine maintenance, leveling, software upgrade, blow out silt |
|
Jun 08 1995
|
TCOON |
[Inspected] - |
|
Oct 24 1994
|
TCOON |
[Repaired] - -->Needs Review: 11-1-94 <-- |
|
Oct 17 1994
|
TCOON |
[Inspected] - |
|
Jul 26 1994
|
TCOON |
[Repaired] - -->Needs Review: 5-05-94 <-- |
|
May 06 1994
|
TCOON |
[Repaired] - -->Needs Review: 5-05-94 <-- |
|
Apr 18 1994
|
TCOON |
[] - |
|
Apr 04 1994
|
TCOON |
[] - -->Needs Review: 3-27-94 <-- |
|
Jan 13 1994
|
TCOON |
[] - -->Needs Review: 7-20-93 <-- |