Site Visit Summaries
20 Mar 2010 08:04 CDT 2010079+08:04 CDT

Overview Datums Bench Marks Data Query Site Visit Daily QC Messages Attributes

011: White Point
Nueces Bay, Texas
27° 51' 38" N   97° 28' 58" W
WHITEP
87751881
 TCOON Site Visit Reports
Jan 1990-Mar 2010
updated 2009349+1455 by rperez
Dec 14 2009 TCOON [Inspected] - Installed Raven XT modem
Mar 10 2009 TCOON [Inspected] - TGLO Annual Levels
Apr 24 2008 TCOON [Inspected] - TGLO Annual Levels
Apr 08 2008 TCOON [Repaired] - Replace Vitel
Feb 12 2008 TCOON [Repaired] - Jetted out well.
Jun 20 2007 TCOON [Repaired] - Jetted out well.
Jun 18 2007 TCOON [Repaired] - Reset GOES info, downloaded log
Mar 21 2007 TCOON [Inspected] - TGLO Levels
Jan 18 2007 TCOON [Inspected Repaired] - Replaced battery,installed IP modem
May 09 2006 TCOON [Inspected] - TGLO levels
Feb 02 2006 TCOON [Inspected Repaired] - Performed O&M & Ran Levels
Dec 21 2005 TCOON [Inspected Repaired] - Replaced battery
Aug 26 2005 TCOON [Inspected Repaired] - Jetted out well
Jun 15 2005 TCOON [Inspected Repaired] - Jetted out well
Mar 01 2005 TCOON [Inspected Repaired] - Jetted out well & snaked sounding tube
Feb 08 2005 TCOON [Inspected Repaired] - Batteries replaced
Jan 28 2005 TCOON [Inspected Repaired] - Installed new Yagi Antenna and RG8 coax
Jan 25 2005 TCOON [Inspected Repaired] - Levels run by TGLO.
Jul 29 2004 TCOON [Inspected Repaired] - Reset freewave; reoriented yagi antenna
Jun 14 2004 TCOON [Inspected Repaired] - Jetted out well.
Apr 01 2004 TCOON [Inspected Repaired] - Performed O&M and Ran Levels
Aug 12 2003 TCOON [Repaired] - Added a new solar panel
Jul 14 2003 TCOON [Inspected Repaired] - Replaced batteries
Jun 30 2003 TCOON [Inspected Repaired] - Reinstalled PA & motherboard
Jun 27 2003 TCOON [Inspected Repaired] - Removed PA
Jun 26 2003 TCOON [Inspected Repaired] - Reinstalled another Vitel 1100
Jun 24 2003 TCOON [Inspected Repaired] - Replaced Aquatrak head/tube
Jun 23 2003 TCOON [Inspected Repaired] - Replaced batteries
Jun 12 2003 TCOON [Inspected Repaired] - Replaced DCP.
Apr 21 2003 TCOON [Inspected] - Removed Power Amp.
Mar 05 2003 TCOON [Inspected] - TGLO levels
Feb 05 2003 TCOON [Established] - Re-Installed Vitel 1100; jetted well out
Jan 24 2002 TCOON [Removed] - Removed Sutron
Nov 07 2001 TCOON [Inspected] - TGLO levels
Sep 06 2001 TCOON [] - New lease owner
Aug 01 2001 TCOON [Inspected Repaired] - Jetted out well
May 02 2001 TCOON [Inspected Repaired] - Completed O&M, installed modem board.
Apr 23 2001 TCOON [Repaired] - Replace wind sensor, Begin O&M
Sep 08 2000 TCOON [Repaired] - CBI - Jetted well
May 01 2000 TCOON [Repaired] - Changed CPU Module
Apr 20 2000 TCOON [Repaired] - Re-installed Sutron
Apr 18 2000 TCOON [Repaired] - Removed RTU to CBI lab
Jan 20 2000 TCOON [Repaired] - repaired thermisters.
Jan 11 2000 TCOON [Inspected Repaired] - TGLO Levels
Dec 13 1999 TCOON [Inspected Repaired] - CBI - Levels run and annual O&M performed.
Oct 25 1999 TCOON [Repaired] - CBI -- replaced aquatrak
Jun 08 1999 TCOON [Inspected] - Levels run by TGLO survey crew
Feb 01 1999 TCOON [Inspected Repaired] - Replaced wind sensor, repaired lock
Jan 20 1999 TCOON [Inspected Repaired] - CBI - Levels run and annual O&M performed.
Oct 28 1998 TCOON [Inspected] - Ran levels.
Feb 19 1998 TCOON [Inspected] - Ran levels for TGLO.
Jan 12 1998 TCOON [Inspected Repaired] - Adjusted Loops 1&2
Dec 18 1997 TCOON [Inspected Repaired] - Extended protective well and sounding tube.
Sep 29 1997 TCOON [Inspected Repaired] - Installed 100 Kohm resistor in GPIO term board
Sep 16 1997 TCOON [Inspected Repaired] - Replaced aquatrack head and cal tube.
Jul 24 1997 TCOON [Inspected] - Ran levels.
Apr 21 1997 TCOON [Repaired] - Replaced aquatrak sensor cable
Apr 17 1997 TCOON [Inspected Repaired] - Reset TNC
Aug 02 1996 TCOON [Inspected] - Routine maintenance, leveling, software upgrade, blow out silt
Jun 08 1995 TCOON [Inspected] -
Oct 24 1994 TCOON [Repaired] - -->Needs Review: 11-1-94 <--
Oct 17 1994 TCOON [Inspected] -
Jul 26 1994 TCOON [Repaired] - -->Needs Review: 5-05-94 <--
May 06 1994 TCOON [Repaired] - -->Needs Review: 5-05-94 <--
Apr 18 1994 TCOON [] -
Apr 04 1994 TCOON [] - -->Needs Review: 3-27-94 <--
Jan 13 1994 TCOON [] - -->Needs Review: 7-20-93 <--
Page last modified on May 15, 2009, at 10:09 AM