005: Packery Channel
Corpus Christi Bay, Texas
27° 38' 4" N   97° 14' 13" W
PACKER
87757921
 TCOON Site Visit Reports
Jan 1990-Nov 2009
Feb 04 2009 [Inspected] - TGLO Annual Levels
Mar 17 2008 [] - Reset IP modem
Feb 06 2008 [Inspected] - TGLO levels performed
Nov 19 2007 [Inspected Repaired] - Replaced water temp thermistor and reset ip modem
Apr 26 2007 [Repaired] - Replaced water temperature thermistor.Reset IP modem
Mar 21 2007 [Inspected] - TGLO Levels
Nov 28 2006 [Inspected] - Installed IP modem
Aug 23 2006 [Inspected] - TGLO levels
Jul 25 2006 [Established] - Established new station
Mar 08 2006 [Inspected] - TGLO levels
Feb 03 2005 [Inspected Repaired] - Annual O&M
Jan 25 2005 [Inspected Repaired] - Levels run by TGLO.
Nov 29 2004 [Inspected Repaired] - Adjusted Loops
Nov 28 2004 [Inspected Repaired] - Changed Antenna
Sep 21 2004 [Inspected Repaired] - Download log; cleared up GPIO check
Sep 08 2004 [Inspected Repaired] - Reinitialize goes; enabled GPIO port
Sep 02 2004 [Repaired] - Reinitialize Comm CPU & sat boards
May 10 2004 [Repaired] - Replaced DCP
Apr 15 2004 [Inspected Repaired] - Performed O&M and Ran Levels
Aug 18 2003 [Inspected Repaired] - Repaired and cleaned well.
Apr 23 2003 [Inspected Repaired] - Performed O&M and Ran Levels.
Mar 05 2003 [Inspected] - TGLO Levels
Sep 09 2002 [Inspected Repaired] - Reset DCP
Apr 09 2002 [Repaired] - Reinstalled DCP and new enclosure.
Apr 08 2002 [Repaired] - Reinstalled DCP .
Apr 05 2002 [] - Remove CPU for repair
Feb 27 2002 [Inspected Repaired] - Re-enable water temp, Re-establish communications
Feb 22 2002 [Inspected] - Performed O & M
Feb 21 2002 [Inspected] - Annual O&M
Nov 06 2001 [Inspected] - TGLO levels
Feb 19 2001 [Inspected Repaired] - repaired cal A
Jan 19 2001 [Inspected Repaired] - repaired cal A
Jan 05 2001 [Inspected Repaired] - CbI-run levels, Complete O&M
Jan 14 2000 [Inspected Repaired] - TGLO run Levels; CBI performed O&M
May 18 1999 [Inspected] - Levels run by TGLO
May 10 1999 [Inspected] - Levels run by CBI
Jan 29 1998 [Inspected] - Levels run by CBI
Apr 03 1997 [Inspected] - Levels run by TGLO
Mar 03 1997 [Inspected] - Verification Levels.
Nov 11 1996 [Repaired] - Set loop one and loop two.
Sep 30 1996 [Repaired] - Inspection
Feb 21 1996 [Inspected] -
Dec 13 1995 [Inspected] -
Nov 13 1995 [] -
Jun 09 1995 [Inspected] -
Nov 04 1994 [Repaired] -
Oct 24 1994 [Inspected] -
Oct 14 1994 [Inspected] -
Jan 12 1994 [] - -->Needs Review: 7-13-93 <--