ROPVO
21 Nov 2009 23:20 UTC 2009325+2320 UTC

ROPVO.HomePage History

Hide minor edits - Show changes to markup

November 04, 2008, at 10:26 AM by 165.95.11.205 -
Changed line 4 from:

Note: ROPVO data is transmitted by GOES satellite only and therefore may have a delay of up to three hours.

to:

Note: ROPVO data is no longer being collected. Data are available from 2007 and earlier

November 04, 2008, at 10:19 AM by 165.95.11.205 -
Changed line 5 from:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=7&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n¢er=23.78525,-93 height=600 width=600:)

to:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=7&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n¢er=23.78525,-97 height=600 width=600:)

November 04, 2008, at 10:16 AM by 165.95.11.205 -
Changed line 5 from:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=5&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n¢er=23.78525,-93 height=600 width=600:)

to:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=7&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n¢er=23.78525,-93 height=600 width=600:)

May 08, 2007, at 12:15 PM by 165.95.1.171 -
Added line 4:

Note: ROPVO data is transmitted by GOES satellite only and therefore may have a delay of up to three hours.

Deleted line 5:

Note: ROPVO data is transmitted by GOES satellite only and therefore may have a delay of up to three hours.

May 08, 2007, at 12:13 PM by 165.95.1.171 -
Changed lines 4-5 from:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=5&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n¢er=23.78525,-93 height=600 width=600:)

to:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=5&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n¢er=23.78525,-93 height=600 width=600:) Note: ROPVO data is transmitted by GOES satellite only and therefore may have a delay of up to three hours.

May 07, 2007, at 06:25 PM by 165.95.1.171 -
Changed line 4 from:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=6&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n height=600 width=600:)

to:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=5&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n¢er=23.78525,-93 height=600 width=600:)

May 07, 2007, at 01:21 PM by 165.95.1.171 -
Changed line 4 from:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:mexico:&zoom=6&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n height=600 width=600:)

to:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:ropvo:&zoom=6&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n height=600 width=600:)

May 07, 2007, at 01:11 PM by 165.95.1.171 -
Changed lines 1-5 from:

Foo
Bar

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO)
en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

to:

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO)
en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

May 07, 2007, at 01:00 PM by 165.95.1.171 -
May 07, 2007, at 12:59 PM by 165.95.1.171 -
Changed line 1 from:

Foo\\

to:

Foo

May 07, 2007, at 12:59 PM by 165.95.1.171 -
Changed lines 1-2 from:

Foo

to:

Foo
Bar

May 07, 2007, at 12:59 PM by 165.95.1.171 -
Changed lines 1-2 from:
to:

Foo

May 07, 2007, at 12:59 PM by 165.95.1.171 -
Added line 1:
May 07, 2007, at 12:59 PM by 165.95.1.171 -
Changed lines 1-2 from:

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO)
en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

to:

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO)
en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

May 07, 2007, at 12:51 PM by 165.95.1.171 -
Changed lines 1-2 from:

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO) en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

to:

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO)
en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

May 07, 2007, at 12:50 PM by 165.95.1.171 -
Changed lines 1-3 from:

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO) en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:mexico:&zoom=6&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n:)

to:

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO) en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:mexico:&zoom=6&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n height=600 width=600:)

May 07, 2007, at 12:46 PM by 165.95.1.171 -
Changed line 3 from:

to:

(:includeurl http://lighthouse.tamucc.edu/gstnmap?stnlist=:mexico:&zoom=6&type=hybrid&title=ROPVO%20Station%20Map&-action=map&cluster=n:)

May 07, 2007, at 12:41 PM by 165.95.1.171 -
Changed line 3 from:

to:

May 07, 2007, at 12:39 PM by 165.95.1.171 -
Changed lines 1-77 from:

(:include Main.DisclaimerText:)

This is the new home page for a joint Mexico-Texas project entitled "Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO) en las Costas y Puertos del Golfo de Mexico (Mexico-Texas) (#39382-U).

Tentative plan for the visit (to be modified/optimized as the visit approaches)

Monday June 23rd in the evening

  • Arrival of Dr. Eustorgio (Toyo) Meza Conde, and maybe Alejandro

Tuesday June 24th:

  • Breakfast
  • Morning:
    • ~ 8:45 AM welcome and introductions
    • Visit with university officials
      • 9:15 brief meeting with Dean Marinez
    • 10:00 AM Rapid general introductions of DNR/TCOON and ROPVO and review of the week's program (~ 30 minutes general presentations from Pat and Toyo)
  • Adjourn the morning session around 11:30 AM and leave for lunch and afternoon visits
  • Afternoon visits of local stations:
    • Bob Hall Pier station (fully instrumented, open coast)
    • Port Aransas tide station (ship channel, water levels and winds)
    • Port Aransas RTNS station (cube system)
    • brief visit at Rockport (similar config as Bob Hall Pier, but different)
  • Evening dinner at the Boiling Pot in Rockport

Wednesday June 25th:

  • Series of detailed presentations and question/answer sessions for a describtion of TCOON/DNR Hardware and Software from sensors to web including the following topics (the order still needs to be optimized):
    • Overview of hardware used at DNR stations with description of instruments and maintenance issues
      • Procedures for maintenance, emergency repairs
      • Tide station Datums/Leveling
        • benchmarks
        • datum computation
        • relating computed datums to other known datums (NAVD88?, NGVD, etc.)
        • publishing datums
    • Presentation of the instruments presently used at the stations that are to be part of ROPVO and discussion of hardware compatibility
    • Discussion of future instruments procurement for both DNR and ROPVO
    • Overview of overall DNR/TCOON data processing model (Pm)
    • Overview of overall ROPVO data processing model
    • Cube
      • building cubes (BH)
      • Communication between instrumentation and cube (BH)
      • data storage on cube (BH)
    • Data retrieval methods used by DNR (BH-brief)
      • phone
      • radio
      • satellite
    • Data storage at DNR
    • Data dissemination from DNR
      • Web
      • Quality Control of the data
      • Automated voice phone system
      • publications
    • Current research at DNR

  • A tentative plan could be for a series of one hour segments with ~ 1/2 hour presentations with another ~ 20 minutes for discussion and a short break before the next segment. (This might be difficult as the topics will likely require different length of times)

Thursday June 26th:

  • Morning
    • Continuation of Wednesday's presentations
  • Afternoon
    • Discussion of licensing issues centered on the possible use of the GNU General Public License.
    • Discussion of how a broader group based on DNR technologies could function.
    • Produce a short document with a list of license requirements and guidelines for groups to join the joint network (requirement on procedures, QA/QC?)

  • Evening: dinner at location to be determined

Friday June 27th:

  • Morning: Regular 9:00 AM - 12:00 AM DNR meeting
    • Brief review of the week's work
    • Scientific talks from Dr. Alexei Sadovski, Dr. Steven Dannelly?, Dr. Meza Conde?. (Possibly Invite other faculty and local scientists from the National Weather Service, the coast guard, emergency management, etc.)
  • Afternoon:
    • Discussion of future plans for the extension of the measurement network and of future joint modeling efforts
    • Plan and schedule for the next steps of development
    • Adjournment of the visit

Friday June 27th evening or Saturday June 28th morning: departure for Mexico

to:

Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO) en las Costas y Puertos del Golfo de Mexico (Mexico-Texas)

June 23, 2003, at 01:53 PM by unknown -
Deleted line 27:
  • Quality Control of the data
Changed lines 50-51 from:
  • Web
to:
  • Web
  • Quality Control of the data
June 23, 2003, at 12:56 PM by unknown -
Added lines 28-34:
  • Quality Control of the data
  • Procedures for maintenance, emergency repairs
  • Tide station Datums/Leveling
    • benchmarks
    • datum computation
    • relating computed datums to other known datums (NAVD88?, NGVD, etc.)
    • publishing datums
Deleted lines 53-59:
  • Quality Control of the data
  • Procedures for maintenance, emergency repairs
  • Tide station Datums/Leveling
    • benchmarks
    • datum computation
    • relating computed datums to other known datums (NAVD88?, NGVD, etc.)
    • publishing datums
June 23, 2003, at 12:40 PM by unknown -
Changed line 30 from:
  • Overview of overall DNR/TCOON data processing model (BH-brief)
to:
  • Overview of overall DNR/TCOON data processing model (Pm)
June 23, 2003, at 12:38 PM by unknown -
Added line 22:
  • brief visit at Rockport (similar config as Bob Hall Pier, but different)
June 23, 2003, at 12:35 PM by unknown -
Changed line 18 from:
  • Afternoon visits of two local stations:
to:
  • Afternoon visits of local stations:
Changed line 22 from:
  • Evening dinner at the boiling Pot in Rockport
to:
  • Evening dinner at the Boiling Pot in Rockport
June 23, 2003, at 12:33 PM by unknown -
Added line 15:
  • 9:15 brief meeting with Dean Marinez
June 21, 2003, at 06:04 PM by unknown -
Changed line 13 from:
  • ~ 8:45 AM Welcome and introductions
to:
  • ~ 8:45 AM welcome and introductions
Changed line 15 from:
  • 10:00 AM Rapid general introductions of DNR/TCOON and ROPVO (~ 30 minutes general presentations from Pat and Toyo)
to:
  • 10:00 AM Rapid general introductions of DNR/TCOON and ROPVO and review of the week's program (~ 30 minutes general presentations from Pat and Toyo)
June 21, 2003, at 06:04 PM by unknown -
Changed line 11 from:
  • Early Breakfast
to:
  • Breakfast
Changed line 13 from:
  • Welcome and introductions
to:
  • ~ 8:45 AM Welcome and introductions
Changed line 15 from:
  • Rapid general introductions of DNR/TCOON and ROPVO (~ 30 minutes general presentations from Pat and Toyo)
to:
  • 10:00 AM Rapid general introductions of DNR/TCOON and ROPVO (~ 30 minutes general presentations from Pat and Toyo)
June 19, 2003, at 05:20 PM by unknown -
Changed line 28 from:
  • Overview of overall DNR/TCOON data processing model
to:
  • Overview of overall DNR/TCOON data processing model (BH-brief)
Changed lines 31-34 from:
  • building cubes
  • Communication between instrumentation and cube
  • data storage on cube
  • Data retrieval methods used by DNR
to:
  • building cubes (BH)
  • Communication between instrumentation and cube (BH)
  • data storage on cube (BH)
  • Data retrieval methods used by DNR (BH-brief)
June 17, 2003, at 07:32 AM by unknown -
Changed lines 16-17 from:
  • Adjourn the morning session around 11:30 AM and leave for lunch and afternoon visit
  • Afternoon visit of two local stations:
to:
  • Adjourn the morning session around 11:30 AM and leave for lunch and afternoon visits
  • Afternoon visits of two local stations:
June 17, 2003, at 07:31 AM by unknown -
Deleted lines 9-11:

Monday June 23rd:

June 17, 2003, at 07:30 AM by unknown -
Changed line 7 from:

Sunday June 22nd in the evening

to:

Monday June 23rd in the evening

Changed lines 11-19 from:
  • Breakfast
  • Morning
    • welcome from university officials
    • Rapid general introductions of DNR/TCOON and ROPVO
  • Afternoon
    • Overview of ROPVO data processing model
    • Presentation of the instruments presently used at the stations that are to be part of ROPVO and discussion of hardware compatibility
    • Overview of DNR/TCOON data processing model
    • Overview of hardware used at DNR stations with description of instruments and maintenance issues
to:
Changed lines 14-20 from:
  • Full day visit of local stations. Tentative list includes:
to:
  • Early Breakfast
  • Morning:
    • Welcome and introductions
    • Visit with university officials
    • Rapid general introductions of DNR/TCOON and ROPVO (~ 30 minutes general presentations from Pat and Toyo)
  • Adjourn the morning session around 11:30 AM and leave for lunch and afternoon visit
  • Afternoon visit of two local stations:
Deleted line 23:
  • Rockport tide station (water levels only)
Changed lines 27-32 from:
  • Series of detailed presentations and question/answer sessions for a describtion of TCOON/DNR Hardware and Software from sensors to web including the following topics:
to:
  • Series of detailed presentations and question/answer sessions for a describtion of TCOON/DNR Hardware and Software from sensors to web including the following topics (the order still needs to be optimized):
    • Overview of hardware used at DNR stations with description of instruments and maintenance issues
    • Presentation of the instruments presently used at the stations that are to be part of ROPVO and discussion of hardware compatibility
    • Discussion of future instruments procurement for both DNR and ROPVO
    • Overview of overall DNR/TCOON data processing model
    • Overview of overall ROPVO data processing model
Added lines 61-62:
  • Continuation of Wednesday's presentations
  • Afternoon
Deleted lines 65-68:
  • Afternoon
    • Overall presentations of what has been accomplished during the week
    • Plan and schedule for the next steps of development
    • possible talks from various people
Changed lines 70-74 from:
  • Morning
    • Brief review of the week
    • Scientific talks from Dr. Alexei Sadovski, Dr. Steven Dannelly, others?. Invite other faculty and local scientists from the National Weather Service, the coast guard, emergency management, etc.
  • Afternoon: Discussion of future plans for the extension of the measurement network and of future joint modeling efforts
  • Adjournment of the visit
to:
  • Morning: Regular 9:00 AM - 12:00 AM DNR meeting
    • Brief review of the week's work
    • Scientific talks from Dr. Alexei Sadovski, Dr. Steven Dannelly?, Dr. Meza Conde?. (Possibly Invite other faculty and local scientists from the National Weather Service, the coast guard, emergency management, etc.)
  • Afternoon:
    • Discussion of future plans for the extension of the measurement network and of future joint modeling efforts
    • Plan and schedule for the next steps of development
    • Adjournment of the visit
June 12, 2003, at 09:31 PM by unknown -
Changed line 27 from:
  • Evening diner at the boiling Pot in Rockport
to:
  • Evening dinner at the boiling Pot in Rockport
June 12, 2003, at 09:31 PM by unknown -
Changed line 61 from:
  • Produce a short document with the draft of the license as well as requirements guidelines for groups to join the joint network (requirement on procedures, QA/QC?)
to:
  • Produce a short document with a list of license requirements and guidelines for groups to join the joint network (requirement on procedures, QA/QC?)
June 12, 2003, at 09:04 PM by unknown -
Changed lines 12-13 from:
  • Morning: Rapid general introductions of DNR/TCOON and ROPVO also welcome from university officials
  • Afternoon:
to:
  • Morning
    • welcome from university officials
    • Rapid general introductions of DNR/TCOON and ROPVO
  • Afternoon
June 12, 2003, at 04:29 PM by unknown -
Changed line 12 from:
  • Morning: Rapid general introductions of DNR/TCOON (Pat) and ROPVO (Toyo) also welcome from university officials
to:
  • Morning: Rapid general introductions of DNR/TCOON and ROPVO also welcome from university officials
Changed line 15 from:
  • Presentation of the instruments presently used at the stations that are to be part of ROPVO and discussion of hardware compatibility (alejandro?)
to:
  • Presentation of the instruments presently used at the stations that are to be part of ROPVO and discussion of hardware compatibility
Changed line 17 from:
  • Overview of hardware used at DNR stations with description of instruments and maintenance issues (jrizzo)
to:
  • Overview of hardware used at DNR stations with description of instruments and maintenance issues
Changed lines 44-46 from:
  • Quality Control of the data (jrizzo)
  • Procedures for maintenance, emergency repairs (jrizzo)
  • Tide station Datums/Leveling (jeffress, jrizzo)
to:
  • Quality Control of the data
  • Procedures for maintenance, emergency repairs
  • Tide station Datums/Leveling
Changed line 57 from:
  • Discussion of licensing issues centered on the use of the GNU General Public License.
to:
  • Discussion of licensing issues centered on the possible use of the GNU General Public License.
Changed line 69 from:
  • Brief review of the week (Philippe or Pat)
to:
  • Brief review of the week
June 12, 2003, at 04:11 PM by unknown -
Changed line 14 from:
  • Presentation of present and potential hardware used at DNR stations with description of instruments and maintenance issues (jrizzo)
to:
  • Overview of ROPVO data processing model
Added lines 16-17:
  • Overview of DNR/TCOON data processing model
  • Overview of hardware used at DNR stations with description of instruments and maintenance issues (jrizzo)
Changed lines 28-34 from:
  • Series of presentations and question/answer sessions for a describtion of TCOON/DNR Hardware and Software from sensors to web including the following topics:
    • Data collection hardware
      • Sutron/Vitel
      • Cube
        • building cubes
        • Communication between instrumentation and cube
        • data storage on cube
to:
  • Series of detailed presentations and question/answer sessions for a describtion of TCOON/DNR Hardware and Software from sensors to web including the following topics:
    • Cube
      • building cubes
      • Communication between instrumentation and cube
      • data storage on cube
Deleted line 39:
  • Data processing at DNR
June 12, 2003, at 01:42 PM by unknown -
Changed line 71 from:
  • Scientific talks from Dr. Alexei Sadovski, Dr. Steven Dannelly, others?. We should invite other faculty and local scientists from the National Weather Service, the coast guard, emergency management, etc.
to:
  • Scientific talks from Dr. Alexei Sadovski, Dr. Steven Dannelly, others?. Invite other faculty and local scientists from the National Weather Service, the coast guard, emergency management, etc.
June 12, 2003, at 11:22 AM by unknown -
Changed line 8 from:
  • Arrival of Dr. Eustorgio (Toyo) Meza Conde, and Alejandro
to:
  • Arrival of Dr. Eustorgio (Toyo) Meza Conde, and maybe Alejandro
Added line 46:
  • Procedures for maintenance, emergency repairs (jrizzo)
Added line 48:
  • benchmarks
Changed lines 51-53 from:
  • datum publishing
  • Procedures for maintenance, emergency repairs (jrizzo)
  • Areas of current DNR research
to:
  • publishing datums
  • Current research at DNR
Deleted line 56:
  • Likely arrival of Dr. Figueroa Nazuno
Changed lines 61-65 from:
  • Afternoon: Welcome of the new guests, short tour of campus. Overall presentations of what has been accomplished during the week and plans and schedules for the next steps of the development
to:
  • Afternoon
    • Overall presentations of what has been accomplished during the week
    • Plan and schedule for the next steps of development
    • possible talks from various people
Changed lines 69-71 from:
  • Morning: Brief review of the week (Philippe or Pat) and scientific talks (also possibility to schedule the talks on Thursday afternoon). Talks from Dr. Figueroa Nazuno, Dr. Alexei Sadovski, Dr. Steven Danely, others?. Invitation of local scientists from the National Weather service, the coast guard and emergency management.
to:
  • Morning
    • Brief review of the week (Philippe or Pat)
    • Scientific talks from Dr. Alexei Sadovski, Dr. Steven Dannelly, others?. We should invite other faculty and local scientists from the National Weather Service, the coast guard, emergency management, etc.
Changed line 73 from:
  • Adjournement of the visit
to:
  • Adjournment of the visit
June 11, 2003, at 12:40 AM by unknown -
Changed line 12 from:
  • Morning: Rapid general introductions of DNR/TCOON (Pat) and ROPVO (Toyo) also welcome from university officials and final discussion
to:
  • Morning: Rapid general introductions of DNR/TCOON (Pat) and ROPVO (Toyo) also welcome from university officials
Changed line 15 from:
  • Presentation of the instruments presently used at the future ROPVO stations and discussion of hardware compatibility (alejandro?)
to:
  • Presentation of the instruments presently used at the stations that are to be part of ROPVO and discussion of hardware compatibility (alejandro?)
Added lines 38-39:
Added line 51:
  • Areas of current DNR research
June 11, 2003, at 12:35 AM by unknown -
Changed line 57 from:
  • Produce a short document with the draft of the license as well as guidelines for what it requires for groups to join the joint network (requirement on procedures, QA/QC?)
to:
  • Produce a short document with the draft of the license as well as requirements guidelines for groups to join the joint network (requirement on procedures, QA/QC?)
Changed line 59 from:
  • Evening: diner at location to be determined
to:
  • Evening: dinner at location to be determined
June 11, 2003, at 12:32 AM by unknown -
Changed lines 18-22 from:
  • Full day visit of the stations starting with the Bob Hall Pier station (fully instrumented, open coast), the Port Aransas tide station (ship channel, water levels and winds), Port Aransas RTNS station (cube system), and the Rockport station (water levels only)
to:
  • Full day visit of local stations. Tentative list includes:
    • Bob Hall Pier station (fully instrumented, open coast)
    • Port Aransas tide station (ship channel, water levels and winds)
    • Port Aransas RTNS station (cube system)
    • Rockport tide station (water levels only)
Changed line 33 from:
  • Data collection methods used by DNR
to:
  • Data retrieval methods used by DNR
June 11, 2003, at 12:29 AM by unknown -
Changed lines 23-26 from:
  • Cube
    • building cubes
    • Communication between instrumentation and cube
    • data storage on cube
to:
  • Data collection hardware
    • Sutron/Vitel
    • Cube
      • building cubes
      • Communication between instrumentation and cube
      • data storage on cube
Changed line 35 from:
  • Data dissemination at DNR
to:
  • Data dissemination from DNR
June 11, 2003, at 12:27 AM by unknown -
Changed line 7 from:

Sunday June 22nd in the evening

to:

Sunday June 22nd in the evening

Changed line 10 from:

Monday June 23rd:

to:

Monday June 23rd:

Changed line 17 from:

Tuesday June 24th:

to:

Tuesday June 24th:

Changed line 21 from:

Wednesday June 25th:

to:

Wednesday June 25th:

Changed line 46 from:

Thursday June 26th:

to:

Thursday June 26th:

Changed lines 48-51 from:
  • Morning: discussion of licensing issues centered on the use of the GPL or General Public License. Discussion of how a broader group based on DNR technologies could function. Produce a short document with the draft of the license as well as guidelines for what it requires for groups to join the joint network (requirement on procedures, QA/QC?)
to:
  • Morning
    • Discussion of licensing issues centered on the use of the GNU General Public License.
    • Discussion of how a broader group based on DNR technologies could function.
    • Produce a short document with the draft of the license as well as guidelines for what it requires for groups to join the joint network (requirement on procedures, QA/QC?)
Changed line 55 from:

Friday June 27th:

to:

Friday June 27th:

June 10, 2003, at 04:54 PM by unknown -
Changed line 12 from:
  • Morning: Rapid general introductions of TCOON (Pat) and ROPVO (Toyo) also welcome from university officials and final discussion
to:
  • Morning: Rapid general introductions of DNR/TCOON (Pat) and ROPVO (Toyo) also welcome from university officials and final discussion
Changed lines 14-15 from:
  • Presentation of present and potential hardware used at DNR stations with description of instruments output and maintenance issues (jrizzo)
  • Presentation of the instruments presently used at the future ROPVO stations and discussion of hardware compatibility (alejandro)
to:
  • Presentation of present and potential hardware used at DNR stations with description of instruments and maintenance issues (jrizzo)
  • Presentation of the instruments presently used at the future ROPVO stations and discussion of hardware compatibility (alejandro?)
Changed lines 27-31 from:
  • data transmission to DNR ?
  • Data collection methods used by DNR
  • Storage of the raw data and processing upon arrival at central location
  • Processing of the data, conversion
  • Data publication
to:
  • Data collection methods used by DNR
    • phone
    • radio
    • satellite
  • Data storage at DNR
  • Data processing at DNR
  • Data dissemination at DNR
Changed lines 35-36 from:
  • Automated phone lines
to:
  • Automated voice phone system
  • publications
Changed line 38 from:
  • Leveling tide stations (jeffress, jrizzo)
to:
  • Tide station Datums/Leveling (jeffress, jrizzo)
June 10, 2003, at 04:44 PM by unknown -
Deleted line 19:
  • If the weather does not permit an effective visit of the stations, the visit will take place on Wednesday
Changed lines 24-25 from:
  • Communication between hardware and cube
  • Communication between stations and central location
to:
  • building cubes
  • Communication between instrumentation and cube
  • data storage on cube
  • data transmission to DNR ?
  • Data collection methods used by DNR
Changed lines 31-32 from:
  • Data publication to the web or automated phone lines
  • Procedures for Maintenance, Emergency Repairs, Quality Assurance, Quality Control of the data
to:
  • Data publication
    • Web
    • Automated phone lines
  • Quality Control of the data (jrizzo)
  • Leveling tide stations (jeffress, jrizzo)
    • datum computation
    • relating computed datums to other known datums (NAVD88?, NGVD, etc.)
    • datum publishing
  • Procedures for maintenance, emergency repairs (jrizzo)
June 10, 2003, at 04:35 PM by unknown -
Changed lines 14-17 from:
  • Presentation of present and potential hardware used at the stations with description of instruments output and maintenance issues
    whose stations? DNRs? or theirs or both?
  • Presentation of the instruments presently used at the future ROPVO stations and discussion of hardwar compatibility
    presently used at the future stations?
to:
  • Presentation of present and potential hardware used at DNR stations with description of instruments output and maintenance issues (jrizzo)
  • Presentation of the instruments presently used at the future ROPVO stations and discussion of hardware compatibility (alejandro)
Changed lines 18-19 from:
  • Full day visit of the stations starting with the Bob Hall Pier station (fully instrumented, open coast), the Port Aransas station (ship channel, water levels and winds), and the Rockport station (water levels only)
    Should the Port Aransas cube station be included?
to:
  • Full day visit of the stations starting with the Bob Hall Pier station (fully instrumented, open coast), the Port Aransas tide station (ship channel, water levels and winds), Port Aransas RTNS station (cube system), and the Rockport station (water levels only)
June 10, 2003, at 04:19 PM by unknown -
Changed line 15 from:
whose stations? Ours or theirs or both?
to:
whose stations? DNRs? or theirs or both?
Changed line 17 from:
presently used at the future stations?
to:
presently used at the future stations?
Changed line 21 from:
Should the Port Aransas cube station be included?
to:
Should the Port Aransas cube station be included?
June 10, 2003, at 04:14 PM by unknown -
Changed lines 14-15 from:
  • Presentation of present and potential hardware used at the stations with description of instruments output and maintenance issues
to:
  • Presentation of present and potential hardware used at the stations with description of instruments output and maintenance issues
whose stations? Ours or theirs or both?
Added line 17:
presently used at the future stations?
Changed lines 20-21 from:
  • Full day visit of the stations starting with the Bob Hall Pier station (fully instrumented, open coast), the port Aransas station (ship channel, water levels and winds), and the Rockport station (water levels only)
to:
  • Full day visit of the stations starting with the Bob Hall Pier station (fully instrumented, open coast), the Port Aransas station (ship channel, water levels and winds), and the Rockport station (water levels only)
    Should the Port Aransas cube station be included?
June 10, 2003, at 02:11 PM by unknown -
Changed line 8 from:
  • Arrival of Dr. Eustorgio (Toyo) Meza Conde, and ALejandro?
to:
  • Arrival of Dr. Eustorgio (Toyo) Meza Conde, and Alejandro
June 08, 2003, at 10:28 AM by unknown -
Changed lines 3-45 from:

This is the new home page for a joint Mexico-Texas project entitled "Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO) en las Costas y Puertos del Golfo de Mexico (Mexico-Texas) (#39382-U).

to:

This is the new home page for a joint Mexico-Texas project entitled "Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO) en las Costas y Puertos del Golfo de Mexico (Mexico-Texas) (#39382-U).

Tentative plan for the visit (to be modified/optimized as the visit approaches)

Sunday June 22nd in the evening

  • Arrival of Dr. Eustorgio (Toyo) Meza Conde, and ALejandro?

Monday June 23rd:

  • Breakfast
  • Morning: Rapid general introductions of TCOON (Pat) and ROPVO (Toyo) also welcome from university officials and final discussion
  • Afternoon:
    • Presentation of present and potential hardware used at the stations with description of instruments output and maintenance issues
    • Presentation of the instruments presently used at the future ROPVO stations and discussion of hardwar compatibility

Tuesday June 24th:

  • Full day visit of the stations starting with the Bob Hall Pier station (fully instrumented, open coast), the port Aransas station (ship channel, water levels and winds), and the Rockport station (water levels only)
  • Evening diner at the boiling Pot in Rockport
  • If the weather does not permit an effective visit of the stations, the visit will take place on Wednesday

Wednesday June 25th:

  • Series of presentations and question/answer sessions for a describtion of TCOON/DNR Hardware and Software from sensors to web including the following topics:
    • Cube
    • Communication between hardware and cube
    • Communication between stations and central location
    • Storage of the raw data and processing upon arrival at central location
    • Processing of the data, conversion
    • Data publication to the web or automated phone lines
    • Procedures for Maintenance, Emergency Repairs, Quality Assurance, Quality Control of the data

  • A tentative plan could be for a series of one hour segments with ~ 1/2 hour presentations with another ~ 20 minutes for discussion and a short break before the next segment. (This might be difficult as the topics will likely require different length of times)

Thursday June 26th:

  • Likely arrival of Dr. Figueroa Nazuno
  • Morning: discussion of licensing issues centered on the use of the GPL or General Public License. Discussion of how a broader group based on DNR technologies could function. Produce a short document with the draft of the license as well as guidelines for what it requires for groups to join the joint network (requirement on procedures, QA/QC?)
  • Afternoon: Welcome of the new guests, short tour of campus. Overall presentations of what has been accomplished during the week and plans and schedules for the next steps of the development
  • Evening: diner at location to be determined

Friday June 27th:

  • Morning: Brief review of the week (Philippe or Pat) and scientific talks (also possibility to schedule the talks on Thursday afternoon). Talks from Dr. Figueroa Nazuno, Dr. Alexei Sadovski, Dr. Steven Danely, others?. Invitation of local scientists from the National Weather service, the coast guard and emergency management.
  • Afternoon: Discussion of future plans for the extension of the measurement network and of future joint modeling efforts
  • Adjournement of the visit

Friday June 27th evening or Saturday June 28th morning: departure for Mexico

June 02, 2003, at 12:56 PM by unknown -
Changed line 3 from:

Describe HomePage here.

to:

This is the new home page for a joint Mexico-Texas project entitled "Red de Observaciones y Predicciones de Variables Oceanicas (ROPVO) en las Costas y Puertos del Golfo de Mexico (Mexico-Texas) (#39382-U).

Page last modified on November 04, 2008, at 10:26 AM