This site is under construction) Development Page--Not for Official Use
|
University Beach ![]() The key components of the monitoring program are: * Shoreline position surveys * Beach profile surveys * Sediment grain size analysis * Aerial photography interpretation Timeline of Data Collection Surveys were conducted both immediately prior to construction and post construction up to May 2005. Several abbreviated surveys were conducted between August 2001 and February 2002 to monitor the rapid change in shoreline morphology anticipated immediately after placement. Thereafter, the surveys were conducted twice annually during the spring and fall of each year. Analysis of the data up to October 2004 has been analyzed.
Purpose of the beach monitoring program:
A primary goal of the monitoring program is to identify trends and assist resource managers in anticipating where, when and how much fill material should be relocated along the existing dry beach to maintain its integrity and promote project longevity. |